Laserfiche WebLink
• <br />• <br /> <br />Doc Date:1 211 112 0 0 1 <br />RULE 3 <br />PERFORMANCE BONDING REQUIREMENTS <br />3.06 -SPECIAL BONDING REQUIREMENTS FOR MINE DRAINAGE FACILITIES <br />III IIIIIIIIIIIIIIII <br />sss <br />Reclamation bonding coverage specifically includes the costs ass«iated with ultimate reclamation of <br />any mine drainage control facilities not previously approved for retention to suppon the approved <br />postmining land use. The ass«iated reclamation liability period includes the period corresponding <br />to construction, operation, and reclatation of these facilities, concluding with completion of final <br />reclamation seeding. <br />PR04 <br />3.0(r 1 <br />Revised August 2000 <br />