Laserfiche WebLink
1 I <br />i <br />J Note: / <br />Specific details on the <br />Main Mine Site are <br />shown on Map 53. / <br />_ -RPE ACCESS /HAUL ROAD <br />yG <br />East S <br />\ \\ Sul _- Iv`er _ - -- <br />c� Drill R° <br />J� Sylvester Gulch —� - - - °d <br />i Live Subsoil <br />Stockpile /i \\ <br />- _SYLVRSM GULCH <br />HAUL <br />�i�CCESS {Z - <br />9��— \ <br />- <br />Pole 9 Rood <br />Pole 10 JRood Pole 12 Pole 13 \ <br />12.47KV Road Road Pole 14 ` \ <br />O•t� POWERLINE - -.� _ ;_.Road RoadSylve Gulch <br />• 0 0 FROM FAN` „, Pole 15 Pole 16 <br />TO PORTALS ..--- Road Rood Pole 17 �\ Fan \ <br />Road \` <br />s <br />-XI 1522 <br />9 16 O \\ Poles 7& 8 Rood r <br />SYLVESTER GULCH <br />FAN 12.47KV \ <br />\ \\ MEADOW ' %' f w , i j r DISTRIBUTION LINE LIVE \ <br />+ -0 9 - DETENTION POND <br />OVERFLOW COLLECTOR <br />CHANNEL <br />(�HAFI SHE / <br />/ TOP;JIL <br />SHAFT #2 (EXHAUST) <br />COMPRESSOR BUILDING / <br />SHAFT #2 (EXHAUST) <br />ROCK DUST STATION <br />BURIED 12" HDPE PIPELINE <br />BURIED 12" HDPE PIPELINE / SHAFT #1 (INTAKE) <br />E SEAM TEMPORARY CHANGE FACILITIES SHAFT #3 (INTAKE) <br />j <br />INTAKE AIR 1 HEATING EBUI BUILDING �% FACILITY <br />PUMPING <br />� SHAFT CONSTRUCTION <br />/ LAY DOWN AREA \ <br />ELECTRIC BOREHOLE <br />S oil <br />\ y ht Use RpO� r <br />SHAFT SITE 12.47K <br />DISTRIBUTION LINE SG -1 Light � — — DEGAS BOREHOLE <br />SnVVBSTM GULCH �� —�_ Use Road <br />Powerline Light Use Road .,;\ 22 <br />SG -1 <br />Sediment Pond \, 21 <br />•\\ \ DRILL ROAD -. _ — Treatment Far, 1 y and / - <br />,.� -?w` y,• _ SUBSOi \ ng Pnnd for Sylvester / V� \\ <br />SYLVESTER GULCH TOCKPI \ \_ <br />1 _ `� ... 1 /i Gulch <br />Line frcm Gulch Mine DeNity n E HOLE <br />rl 46KV TAP LINE <br />»*, - ~� ywe :ter Gulch / ELECTRIC DISTRIBUTION LINE <br />(DMEA) i'/ �5,/ - L'ne Light Use Road \ ti Main Mine site i <br />ubsiatbr, back - <br />e f - 17.47KV \ <br />FFROM PORT <br />aji \ TO WAREH( <br />I <br />l'1 <br />1�V / I <br />Ll l <br />it <br />POTABLE <br />WATER <br />TANK <br />1 �\ <br />SWITCHGEAR <br />BUILDING <br />- F -SEAM <br />PORTALS <br />'.1 <br />II <br />$�I <br />1 <br />�r11 <br />• rr4 6 <br />LEGEND <br />Is Powerpoles <br />Powerline <br />Trans mission <br />d <br />1.2 MM GALLON <br />T MINE WATER TANK <br />L19h1 <br />- <br />use Rood <br />\ \l1 <br />1 <br />II <br />1'\ <br />\�1 <br />r� �I <br />r, <br />NOTES: <br />DUE TO LIMITED LEVEL SPACE ON THE <br />MINE SIITE, SUPPLIES AND MATERIALS MAY BE <br />STORED ALONG ROADS AND OTHER OPEN, <br />PREVIOWSLY DISTURBED AREAS, WITHIN THE <br />DRAINAGIE CONTROL SYSTEM, EXCEPT POND <br />EMBANKWENTS, TOPSOIL STOCKPILES, AND <br />PERMANENTLY REVEGETATED AREAS, THOUGH <br />NOT IDEINTIFIED AS SUCH ON THIS MAP. <br />STORAGE: AREAS WILL BE CONSOLIDATED <br />AS POSSIBLE. <br />THE ROADS TO POLES 7 THROUGH 17 ARE <br />LIGHT -U1SE ROADS. <br />SMALL TrOPSOIL STOCKPILES ARE LOCATED <br />AT THE END OF POLE 9, 11, 12, 13, 14, <br />AND 16 ROADS <br />SYLVESTER( <br />SUBSTATION <br />N <br />-\ o newotering Eoreholes <br />Rar_irculotl= n Borenole <br />SYLVESTER GULCH <br />MINE WATER PUMPING FACILITY <br />TOPSCIL <br />PILE 03 <br />DEWATERING FACILITY <br />12.47KV DISTRIBUTION LINE <br />THIS DRAWING WAS PREPARED UNDER <br />WY SUPERVISION AND REPRESENTS <br />INFORMATION THAT IS ACCURATE TO <br />THE BEST OF MY KNOWLEDGE <br />E� <br />RECEIVED <br />MAY 0 2005 <br />Division at s GeologY <br />RANGE 90 WEST, TOWNSHIP 13 SO <br />0 UNTAIN COAL WEST ELK MINE <br />COMPANY, L.L.C. P.O. BOX 591, 5174 HWY. 133 <br />SOMERSET. CO. 81434 <br />Map 53B Surface Facilities <br />Sylvester Gulch Facilities Area <br />West Elk Mine <br />ENGINEERING /DRAWING BY SCALE DATE <br />GBG 1"=300' 10 —foot July 1998 <br />APPROVED BY DATE REV. — REV NO. ACAD DRAWING NO. <br />HAB 4/05 — MR 305 GBG N3SP053B. DWG <br />5/03 — MR 307 MJP <br />