Laserfiche WebLink
• <br />III IIIIIIIIIIIII III Doc Date:12/11/2001 <br />~I~ sss <br />d 2.05.5 Post-Mining Land Use /~ <br />The post-mining land uss will bs for agrlcultureJrangsland <br />and wildlife habitat. This uss remains the same as pre-mining <br />and exiating land uses. The proposed reclamation plan will <br />achieve this without supplemental activities. This uss is <br />consistent with the desires of the surface owners, and is <br />applicable to local and state land use program. No long term <br />facilities, other than the quonset building and pre-mine <br />existing roads, will remain after reclamation is completed. <br />reclamation <br />Dua to the small size of this operation, supplemental <br />• <br />management •ctivitiss are not expected to be necessary. <br />Reclamation of disturbed areas, sealing of abandoned mine <br />workings, eliminstion of old gob piles, and abandoned mine <br />structures should result in land less hazardous and of <br />higher productivity without negative impacts on wildlife, <br />air or water quality. See Maps 1 ~ 7. <br />r ~ <br />U <br />