Laserfiche WebLink
~( <br />III IIIIIIIIIIIIIIII <br />999 _ _ - <br />Doc Date:1211112001 <br />• SECTION 6.0 Stock Tank and Dozer Basin Construction Through tests. <br />6.1 Stock Tanks <br />This section updates the bcation of all constructed stock tanks through 1998 (see Map(s) 3 Section <br />3.0). The average tank density for Trapper mined-land areas will not exceed one tank per ten acres. <br />Table 8-1 describes the as-buiR tank density in association with the speafic drainage areas. <br />In 1998, Trapper constructed no new stock tanks and there are no new stock tanks proposed for 1999. <br />F~dsting stock tanks meet applicable certification standards. <br />6.2 Dozer Basins <br />As a resuR of the approval of technical revision TR-73 (1/9n, dozer basin locations will be provided in <br />this Append'a W documents on an annual basis (see Map(s) 3 Section 3.0). <br />Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br />Sediment Impoundment leaning. Dozer basins are typically consWcted abng haulroads, regraded <br />• spoiB, and/or on short or bng term disturbed sites. <br />mn sau <br />r~~ <br />• <br />