Laserfiche WebLink
i <br />~_ <br />r <br />~ iii iiiiii~iiiiii iii <br />~• <br />~~PENCOR <br />PIONEER <br />~ ENGINEERING <br />~ CORPORATT; ~ a'~~~ ~. <br /> <br />December 17, 1990 <br />Mr. Harry B. Ranney <br />Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Carbon Junction Canyon Mine <br />Permanent Channel Design <br />Diversion Ditch No. 1 Design <br />Dear Harry: <br />b7ined Land <br />Reclamation '.+i•~ 'on <br />on behalf of Pueblo Coal Inc., please find our redesign of the above <br />captioned items. The basic design criteria are attached hereto. <br />Should you have any questions of these designs or any other questions <br />concerning PCPs permit, please feel free to call. <br />Sincerely, <br />ENGINEERING CORPORATION <br />Darry A. <br />President <br />DAF/dab <br />Enclosure <br />cc: Jim Hendricks <br />Dave Sturqea <br />DRILLING DEVELOPMENT OPERATIONS ENGINEERING <br />