Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />PROJECT fDENTIFICATION <br />Date : 16-Sep-2005 Permit or job no.: C-1996-083 Site :Bowie No. 2 Mine <br />User : JRS Abbreviation : none State :Colorado <br />Filename : C083-000 County :Delta <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or iob action :Minor Revision 62 <br />ASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />211 -Plug and Seal One Gob Vent Borehole and Cut One Additional Casing borehole 1 12.0 $3,977 <br />212 -Regrade Drill Pad dozer 1 5.2 $930 <br />213 -Replace Topsoil from Stockpile to Drill Pad dozer 1 2.0 $368 <br />214 -Reseed Drill Pad revege 1 0.5 $868 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suarorALS: 19.8 $8,143 <br />' includes inflation factor atljusMent of: NA % TOTAL DIRECT COST' $8,143 <br />.. .. o: .... ~ r :z :: ;: .. :., <br />(DIRECT COSTS <br />OVERHEAD AND PROFIT- Liability lnSUranCe: 2.02 %Of dlreCt total= $124 <br />Performance bond : 1.05 % of direct total = $65 <br />Job superintendent : 9.93 hrs'...$/hr. $37.50 total = $372 <br />Profit : 10.00 % o(direct total = $614 <br />'assume net hours=50%ol task hours TOTAL08P= $1,175 <br />LEGAL -ENGINEERING • PROJECT MANAGEMENT - CONTRACT AMOUNT (direcl+ 0 8 P) _ $7,318 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contracUbid preparation : 4.25 % of cntr. NA total = $311 <br />Reclamation management and/or administration : 3.25 % of colt NA total = $238 <br />CONTINGENCY - NA' NA iota) = NA <br />'contingencies accounted rot at rack level TOTAL INDIRECT COST = $1, 724 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $7,867 <br /> <br />