Laserfiche WebLink
.-_-~ ~ = <br />C ~ W C ENGINES ING. c. • '++'IIIf +~II"'~'ll <br />~ ~ ~" <br />1660 SOUTH ALBION STREET • SUITE 500 • DENVER, COLORADO 80222 • (303) 757$513 ~r <br />l07 <br />Mr. Tom E. Brubaker, President <br />VALCO, Inc. <br />P. 0. Box 550 <br />Rocky Ford, Colorado 81067 <br />Dear Tom: <br />March 30, 1988 1'\r ~~ <br />WRC File: 1664/1 <br />As per our meeting on March 25, 1988, WRC Engineering, Inc. is pleased to <br />submit this proposal for your consideration and approval to provide <br />engineering services in connection with the permit requirements for Pueblo <br />East Pit. <br />We propose the scope of our services for the first phase of this work to <br />include: <br />1. Conduct field investigations and field surveys aimed at assessing <br />the field conditions related to the two Arroyos and Booth-Orchard <br />ditch. Surveying data will be secured to enable us to determine the <br />carrying capacity of the existing structures that will be impacted <br />or have an impact on the mining project. As we agreed to, VALCO, <br />Inc. will provide an individual who will aid the WRC staff with the <br />surveying activities. <br />2. Conduct hydrologic analysis aimed at determining the 5-, 10-, 25-, <br />and 100-year frequency peak flows for the two Arroyos using TR-55 <br />(SCS). <br />3. Compute the capacity of Orchard-Booth ditch, and determine the <br />frequency of flooding that it provides based on peak flows computed <br />in item 2 above. <br />4. Prepare and submit a letter report, documenting the findings, and <br />make recommendations to VALCO, Inc. <br />Our engineering fees to complete the above listed tasks will be $1,350. <br />We will proceed with the project as soon as we are in receipt of a signed copy <br />of this letter proposal. We estimate the time required to complete these <br />services to be approximately 2 to 3 weeks from the date of receipt of a signed <br />copy of this proposal. Your signature and the return of a copy of this <br />proposal to us shall constitute our contract and notice to proceed. <br /> <br />(SAY 41988 <br />CONSULTING ENGINEERS MINED LAND <br />RECLAMATION DIVISION <br />