Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />Doc Date:12I1112001 <br />• RULE 2 PERMITS <br />~.; 2.01 PERMITS - GENERAL REQUIREMENTS <br />2.01.1 Scope <br />This Section establishes the minimum general requirements for permits <br />required to operate off-site loadout facilities not in conjunction with <br />a specific coal operation. The objective of this Section is to ensure <br />that these operations make timely applications for permits, and that all <br />operations are maintained under permits issued in accordance with the <br />requirements of the Colorado Surface Coal Operation Reclamation Act and <br />regulations promulgated thereunder. <br />2.01.2 General Requirements for Existino Operations <br />The information contained within this application is designed to effect <br />• compliance with the. Regulations of the approved Colorado program. <br />Therefore, the format of this application has been developed to follow <br />the requirements of the Colorado Regulatory Program. As required, Mt. <br />Harris is filing this application with the Division to comply with the <br />applicable provisions of Rules 2 and 4. <br />2.01.3 General Requirements for Permits for All Surface Coal Ooeration <br />Operations <br />Mt. Harris has prepared this application in compliance with the <br />applicable requirements of Rules 2 and 4 of the approved Colorado <br />program. <br />2.01.4 Permit Requirements for New Surface Coal Operation and <br />Reclamation <br />Operations <br />• Operations at Mt. Harris coal loadout facility are described herein and <br />will be conducted in accordance with rules 2 and 4. <br />2.01-1 <br /> <br />