Laserfiche WebLink
~- <br />~~'~'c .~ ~/fit <br />~ III IIIIIIIIIIIII III <br />Permit No. _?9_34 __ <br />` STATE OF COLORADO <br />)~)~~ 1 yr ~y01 MINED LAND RECLAMATION BOARD <br />.. ,. <br />Department of Natural Resources <br />fJ~iPiFD liiFdD RFCi.P,~~„ z i!OiJ <br />Colo Dg~319`iti~NL~Hr~laEp!i6t~geet, Room 423 Telephone: (303) 866-3567 <br />Denver, Colorado 80203 <br />Mjyjyy_P~gMjI___MIJERALS._4IHEL_ItlAb_GIl9L <br />THIS PERMIT is issued this 26 day of May , <br />198_1 by the Mined Land Reclamation Board, Department of <br />Natural Resources, State of Colorado <br />RELiIALS <br />A. _Farrington_Contracti~_Com~an~, ("operator") desires to Con- <br />duct a mining operation known as the Gardner Gravel Pit <br />------------ <br />for the purpose of extracting sand and grave3 ___-_~ <br />B. On Septem~er_27 ____, 1879 _. the Mined land Reclamation <br />Board ("the board") approved operator's application for <br />this permit. fixed the amount of bond and directed that <br />this permit be issued upon the filing with the Mined land <br />Reclamation Division ("the division") of bond in the amount <br />so fixed together with surety or sureties thereon in form <br />and substance approved by the division, and such bond and <br />sureties have Deen so furnished. <br />C. The board on September_27r 1979 made the following find- <br />ings: <br />I. the application for this permit complies with the <br />requirements of the Colorado Mined Land Reclamation <br />Act. G.R.S. 1973. 34-32-101 ~=_~Qp. as amended ("the <br />Act") and with all applicable local. state and federal <br />laws; <br />2. the operation will not adversely affect the stability <br />of any significant, valuable. and permanent man-made <br />structure located within two hundred feet of the affected <br />land, except where there is an agreement between oper- <br />ator and the persons having an interest in the struc- <br />ture that damage to the structure is to be compensated <br />for by operator; and <br />3. the proposed mining and reclamation operations can be <br />carried out in conFormance with the requirements of <br />the ACt. <br />0. Operator has made a showing satisfactory to the board: <br />L (1) that it will employ. during and after its underground <br />mining and surface operations, procedures reasonably designed <br />to minimizer as much as practicable. environmental disturb- <br />ance from such operations; (2) that it will provide for <br />reclamation of the affected lands appropriate to the subse- <br />quent beneficial use of such lands; and (3) that, in the <br />event of the failure of its proposed reclamation plan, it <br />will take whatever measures may be necessary to assure the <br />success of reclamation of the lands affected by such oper- <br />h <br />_~ <br />