My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115754
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:43 PM
Creation date
11/25/2007 1:17:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007057
IBM Index Class Name
Permit File
Doc Date
9/24/2007
Doc Name
Comments
From
OSE
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~o ~ LJ <br />~~ ~ STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resourcea ~ <br />Department of Natural Resources ~.~„ <br />1313 Sherman Street, Room 818 6 A ~•'Oo""I' <br />Denver, Colorado 80203 1 ~ (~-~~ 1 i~D '' ' ' <br />Phone (303) 886.3581 t/ <br />FAX (303) 866.3688 SEp <br />M~1nvWw.Nater.stete.oo.u9 '2 4 2007 Governor Jr. <br />1n DNISIy,, , . <br />Irv Mlnin ~y~~tipn, Hama D. merman <br />D entl $0/pty Exewtiva Director <br />DATE: September 24, 2007 (Vacanry <br />state Engineer <br />TO: Bob Oswald, Environmental Protection Specialist <br />CC: Division 3 Office; District 20 Water Commissioner <br />FROM: Clay Kimmi, P.E. <br />RE: Airport Corner Pit, File No. M-2007-057 <br />Operator: Navajo Development LLC <br />Contact: John Parker (719) 850-8443 <br />Section 6, Twp 41 N, Rng 1 E, NM P.M., Mineral County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />~OMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.