Laserfiche WebLink
<br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, Colorado 80703 <br />Phone: (303) 866-3567 <br />FAX:1303)832-8106 <br />August 25, 1994 <br />Mr. W.B. Paynter <br />Washington County <br />117 Main Box A <br />Akron, CO 80120 <br /> <br />- ~--r A ^rr OF COLOR~°~DO <br />III IIIIIIIIIIIII III <br />999 <br />Re: M-94-077, Nickell Gravel Pit, Permit Issuance <br />Dear Mr. Paynter: <br />~~ <br />DEPAR'T'MENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5 Lochhead <br />Execwrve Director <br />Michael B long <br />Division Dnecior <br />On August 25, 1994, the Division of Minerals and Geology found Washington <br />County to have satisfied the applicable requirements of C.R.S. 34-32-101 et <br />sec. for obtaining a mining and reclamation permit. Therefore, a permit is <br />being issued. Two signed originals of the permit have been executed. We have <br />kept one copy for our files and are enclosing one copy for your use. Please <br />read the terms of the permit. It is your responsibility to comply with all of <br />the terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, to <br />be an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments. Rule 1.9 to Technical Revisions. and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, August 25, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$225.00. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for 112 Permits, <br />and Statute Section 34-32-116(1>(a) for 111 Permits, for the specific annual <br />report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />M CHAEL B. LON <br />Division Director <br />Enclosure <br />MBL/ACS/amm/'lri6RG <br />