Laserfiche WebLink
.~ <br />STATE <br />DIVISION OF MINERALS AND GEOLOGY <br />Departmem of Namal Resources <br />1313 $Irerman St., Room 215 <br />prover, Colorado 80203 <br />Plane: 13031866-3567 <br />FAX: (303)832-8106 <br />~ nl ~2l -I'oo <br />OF COLORADO <br />^_ <br />DEC 10 1937 <br />DIViSiOn pt I+w ic:d~a a vuuc:y~ <br />~T~L <br />LffiTED IlSPACT OPERATION (110) <br />RECLAMATION PERMIT APPLICATION PACKAGE <br />~I~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Rartc <br />Goerrnr <br />)amen S Loahlw~d <br />6eavrive Dirtaor <br />Midnd B. Lang <br />Division Dincbr <br />This application package is for a construction material extraction operation <br />affecting LESS than 10 acres. If you plan to conduct a construction material <br />extraction operation which meets these criteria, please follow the instructions <br />provided in this package, in the Rules and Regulations, and in the Colorado Land <br />Reclamation Act for the Extraction of Construction Materials, as required. <br />RECOMMEIQDATIONS PRIOR TO FILING: <br />The Construction Material Rules and Regulations (the Colorado Land Reclamation <br />Act for the Extraction of Construction Materials, Section 34-32.5-101, et seQ•, <br />C.R.S., and 2 CCR 407-1), and the Colorado Mined Land Reclamation Board (the <br />"Board") regulate the permitting, operational and reclamation requirements for <br />all construction material extraction operations in Colorado. It is your <br />obligation to comply with the Act and Regulations. You are encouraged to obtain <br />and review a copy of the Rules, available for $8.0o from the Division of Minerals <br />and Geology (the "Office"). In order to submit your application properly, it is ~ <br />recommended that you review the Act and: ,; <br />Rule 1.1 Definitions; <br />Rule 1.4 Application Review and Consideration Process; <br />Rule 1.6 Public Notice Procedures; <br />Rule 3.1 Reclamation Performance Standards; <br />Rule 3.3.1 Operating without a Permit -Penalty; <br />Rule 4 Performance Warranties and Financial Warranties; <br />Rule 6 Permit Application Exhibit Requirements; <br />Rule 6.2 General Requirements of Exhibits; <br />Rule 6.3 Specific Permit Application Exhibit Requirements; <br />Rule 6.5 Geotechnical Stability Exhibit (as required). <br />