My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113665
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:52 PM
Creation date
11/24/2007 10:52:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977365
IBM Index Class Name
Permit File
Doc Date
2/12/1981
Doc Name
GRAVEL OPERATIONS
From
DOW
To
PARK CNTY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />STATE OF COLORADO <br />fl•lurd D. lainm. Oer•rnar <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WILDLIFE <br />Jack R. Orl~b, Dlractor <br />8080 Broadway <br />Denver, Colorado 80218 825-1 1 82~ <br />Robert Freitag <br />Road and Bridge <br />Park County <br />Dear Bobr <br />• <br />February 12, 1981 <br />iii iiiiiiiiniu iii <br />999 <br />Re: Gravel Operations <br />Bhclosed are the recommendations as we discussed on <br />February 11, 1981, during the on-site inspections. The <br />recommendations, if followed, should provide for minimal <br />impact on the fisheries resource and water quality. <br />Roberts Tunnel Site - A settling pond should be con- <br />structed at the river side of the gravel mound. As the' <br />hill is taken down so should the settling pond. The settling <br />depression should prevent direct discharge to the river from <br />normal runoff. <br />Valley of the Sun Site - Because of the close proximity <br />to the Middle Fork of the South Platte a diversion ditch and <br />settling pond should be constructed. The diversion ditch <br />should lie between the river and the gravel operations and as <br />close to the gravel cut as possible. The ditch should be <br />designed such that it catches normal runoff and directs it <br />to a settling pond. <br />Thank you for this opportunity to comment on the operations. <br />Respectfully submitted, <br />Z <br />ames M. nes <br />District Wildlife Manager <br />DEPARTMENT OF NATURAL RESOURCES, Harris Sherman, Executive Director • yrILDLIFE COMMISSION, Varnon C. Williams, Chairman <br />Thomas Farley, Vice Chairman • Sam Caudill, $ecretary 1 Jeen K. Tool, Membar • Roger Clark, Member <br />Jay K. Childress, Member r Dean Hull, Membet • Dean Suftle, Member <br />
The URL can be used to link to this page
Your browser does not support the video tag.