Laserfiche WebLink
TYPICAL SECTIONAL ELEVATION OF POND EMBANKMENTS <br />SCALES H I °= 10' VIII =51 TOP <br />WIDTH <br />TRASH RACK <br />AND ANTIVORTEX- <br />DEVICE, SEE DETAIL <br />0.1' <br />10 YEAR .� <br />PONDING LIMIT <br />MRE� <br />SEDIU7RO <br />Varies <br />OSM <br />HEIGHT <br />SPILLWAY DESIGN 0 <br />PONDING LEVEL m <br />Lu <br />� LL <br />TOP OF RISE <br />ELEVATION <br />� I <br />uw) 3 1 <br />W <br />ELEVATION OF HOLES <br />RISER DETAIL <br />ONE,TWO OR THREE <br />HOLES, SIZE VARIES a <br />eboard <br />I� <br />z <br />�- B T{ <br />WS <br />24° RISER <br />ELEVATION OF <br />EMERGENCY SPILLWAY <br />I l' <br />2 <br />ANTISEEP COLLARS AT <br />20' SPACING EXTENDING ONE <br />PAST DAM <br />CUTOFF TRENCH <br />^Ja0o <br />0000 <br />e 0 <br />o <br />L, a o <br />a •0 D <br />o Do <br />Note: <br />Trash rock and antivortex devices have been replaced <br />with expanded metal screens attached to top of riser. <br />ONSTRUCTED <br />MBANKMENT <br />EIGHT <br />TRAS RACK AND ANTIVORTEX <br />VICE DETAIL <br />DESIGN BY SO CONSERVATION SERVIC <br />ELEVATION OF HOLE <br />= CREST ELEVATION <br />18rr CONDUIT <br />TYPE 3 <br />a1 <br />z <br />TYPICAL DITCH SECTION <br />SCALES H :I0I =51 V ;I " =2.5I <br />i <br />51 '/2" <br />• 2t I /z" � <br />25e /4'� Ala �1101t <br />a lasie <br />27 <br />e 12" <br />s <br />RIPRAP ENERGY <br />j DISSIPATOR <br />/ <br />r <br />Cr <br />C.M. P' l <br />B <br />i <br />LS I "x I ".I/4' <br />112' DIa. Cost, <br />Lug Fasteners <br />O <br />'6. 3'8' o ape <br />II. at E0,::m:1y <br />U RC Is <br />24° DIAM ER PLA <br />ez i F` 21'n° 21 - 6 <br />r <br />o' Nvf}le Plate <br />BE NG DIAGRAM _ _ <br />FOR b ©aj)RODS 5 j.'6" <br />ROD SCHEDULE 12° 1 I_ L.1 __ `__- - - -_ ,-__:_ •, _____ ,__ <br />r (Inside Radius) ryy <br />C l 461Y <br />o°' H <br />1/2" Did. Cast <br />Lug Fasteners <br />f M1J <br />e 9.. <br />BENDING DIAGRAM <br />FOR Q RODS <br />• Indicates 24" Riser dimension <br />ROD <br />24" <br />B <br />205/16 <br />C <br />1211 <br />d <br />3/4.1 <br />.feel Ant vortex Baffle <br />Mirlmwn Thickness 12 Go,ge <br />t -may d)- Rod i th Thra dad <br />12 y1/2" 1 Ends ,rd dos• y fasteners <br />1/2' t Gauge of F,pe- - i4 9" 6 "J <br />BENDING DIAGRAM SECTIONAL ELEVATION B -B <br />FOR d) RODS <br />NOTES I. Weld, O, and (f rods to `) rods and weld l a , rods to top plate. <br />2. When `�e1,) rodq are used, weld them to the ` o f rods that ore perpendicular (or the two C� <br />rods motet nearly perpendicular) to the anti /- vortex baf f le plate. <br />3. The trash rock may be fabricated to Identical halves and attached to the baffle picte with <br />%2 inch diameter U bolls spaced approximately 12 inches c -c along the vertical n' al <br />InL itneJ %ec tion. of the CI rod; next to tnr plate. <br />DITCH SCHEDULE <br />POND SCHEDULE <br />POND 1. D. (a) <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />K <br />L <br />M <br />N <br />N' <br />VOLUME (AF) <br />/64:2 <br />6.9 <br />/./ <br />/0•/ <br />3.3 <br />/.8 <br />2.9 <br />2.6 <br />5.5 <br />g:4 <br />/.7 <br />6.4 <br />Z,6 <br />2.4 <br />o:wQ <br />/O <br />/O <br />/00 <br />/00 <br />DESIGN Q (CFS) <br />4- <br />//3 <br />372 <br />2/6 <br />4 <br />/9 <br />77 <br />65 <br />40 <br />30 <br />:) M a: <br />58 <br />/6 <br />72 <br />1­2 <br />86 <br />72 <br />z <br />2 <br />2 <br />4 <br />3 <br />2 <br />2 <br />2 <br />2 <br />I°pO <br />ELEVATION(Ft) <br />8/65.6 <br />8208.9 <br />B /90./ <br />8/891 <br />8/66.9. <br />8/¢6.6 <br />8/50.7' <br />8/53.0 <br />8/69.0 <br />8/77.9 <br />8270•/ <br />9/82.0 <br />29/08,7 <br />8/57,3 <br />4 <br />4 <br />4 <br />4 <br />4 <br />41 <br />¢ <br />¢ <br />SLOPE (Ft /Ft) <br />.0/ <br />0075 <br />.005 <br />.007 <br />,0/ <br />•007 <br />•0/ <br />10/ <br />•0/ <br />.005 <br />005 <br />005 <br />1003 <br />•005 <br />O/ <br />005 <br />.005 <br />D (Ft) <br />9 <br />POND VOLUME (AF)(C <br />39.8 <br />170 <br />3.3 <br />25.1 <br />/¢.¢ <br />$.3 <br />7.,? <br />5. 7 <br />14-16 <br />16.4- <br />3.8 <br />16-6 <br />8.2 <br />S It <br />2.4 <br />OSM HEIGHT(U /S <br />8.0 <br />6./ <br />5.9 <br />7.5 <br />g,� <br />7.9 <br />7.3 <br />63 <br />8.2 <br />8.5 <br />572 <br />8.7 <br />8.3 <br />4.6 <br />64.6 <br />Toe to Spillway, Ft) <br />3.4 <br />Z <br />( ,� <br />CONSTRUCTED (b) <br />12.6 <br />/O.3 9. 7 <br />/2.6 <br />/2.0 <br />J J. J <br />//./ <br />8 9 <br />/2, ¢ <br />11.8 <br />9.0 <br />1'e-4 <br />//• 4 <br />7.7 <br />Lu <br />HEIGHT AT (Ft) <br />Y <br />a <br />SEO HEIGHT (Ft) <br />8.7 <br />6.8 <br />7.2 <br />9.5 <br />9.7 <br />8.6 <br />8.6 <br />�.5 <br />y8 <br />92 <br />6.5 <br />9.8 <br />8. 9 <br />5.2 <br />m <br />M <br />CONSTRUCTED (b) <br />817E wl <br />8215 3 <br />9/99.7 <br />0 <br />o'17,2.01,815-5.1 <br />64156.1 <br />8/58.4 <br />$176.9 <br />8/86.8 <br />9279.0 <br />819F r <br />g / /S¢ <br />8/62.7 <br />o <br />CREST ELEV. (Ft) <br />0 <br />CREST <br />650 <br />103-0 <br />500 <br />500 <br />370 <br />400 <br />900 <br />800 <br />8/0 <br />350 <br />6/0 <br />4 .SO <br />720 <br />880 <br />LENGTH (Ft) <br />TOP WIDTH (Ft) <br />17, f <br />8.9 <br />8,7 <br />17./ <br />B. ¢ <br />9 I <br />9. 0 <br />6.7 <br />'7.2 <br />9 2 <br />8.5 <br />9 3 <br />9. 2 <br />8. <br />TYPE OF RISER <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />,3 <br />3 <br />LLJ <br />TOP OF RISER <br />8170,(P <br />82/A7 <br />8/92./ <br />8/87. g <br />81696 <br />8152.5 <br />8153.5 <br />8155:9 <br />x173.7 <br />81801 <br />8271.7 <br />8186,7 <br />8112.8 <br />8160.1 <br />p <br />ELEVATION (Ft) <br />X <br />SIZE OF HOLE(S) <br />39S•5t <br />2Qr03 <br />/,w 3.61 <br />39 X91 <br />285•/0 <br />/co st <br />/CvS.00 <br />/P3.9/ <br />/ 5.93 <br />204.9 <br />/ ®3.73 <br />ZG�¢9 <br />/G�4.8/ <br />/�iJ9.88 <br />a <br />(Inches) <br />� <br />ELEVATION OF <br />8165.6 <br />8208.9 <br />8/9o./ <br />8184.9 <br />81ill <br />9146.6 <br />8150.7 <br />8153.0 <br />9149.O <br />29/779 <br />8270.1 <br />8182.0 <br />8/08,7 <br />815'73 <br />HOLES (Ft) <br />} <br />DESIGN (d. <br />/00 <br />Z5 <br />23- <br />/00 <br />25- <br />25 <br />25 <br />25 <br />25 <br />25 <br />23- <br />25 <br />25 <br />25 <br />a <br />FREQUENCY (Yrs) <br />3 <br />J <br />CREST <br />8/70.7 <br />82//.29 <br />8192.2 <br />8/87.5 <br />8169.7 <br />8152.6 <br />8153.6 <br />8156.0 <br />0173.8 <br />8/8 2 <br />8271.8 <br />491896'.619112,9, <br />8160.2 <br />a <br />ELEVATION (Ft) <br />u' <br />CREST <br />50 <br />3-4 <br />15 <br />55 <br />40 <br />60 <br />4-0 <br />24 <br />50 <br />30 <br />/0 <br />25 <br />35, <br />20 <br />LENGTH (Ft) <br />Z <br />Ld <br />DESIGN DEPTH (Ft) <br />2.3 <br />2.0 <br />.9 <br />/.5- <br />/.0 <br />/. 0 <br />/'0 <br />/.0 <br />/.0 <br />40 <br />.8 <br />/0 <br />/10 <br />40 <br />Ld <br />w <br />FREEBOARD (Ft) <br />/.O <br />/10 <br />/./ <br />iv <br />40 <br />/0 <br />/•0 <br />/0 <br />/.0 <br />/.0 <br />1.19 <br />/.0 <br />/,0 <br />/•0 <br />(a) Reference-KERR MINE AREA SURFACE WATER HYDROLOGY (KCC MAP 16) <br />(b) Includes Mandatory 5% Extra for Settlement. <br />(01ricludes 100% Sedimentation Volume and Routed 10 Year 24 Hour Flood Volume. <br />(d)Spillway locations are shownon Figures 1 -14 <br />DITCH 1. D. (b) <br />ql <br />A2 <br />B'(a) <br />B2 <br />C' <br />D' <br />F(!I <br />G' <br />H' <br />I' <br />I?a) <br />13 <br />K' <br />M' <br />N' <br />N <br />14 <br />DESIGN <br />FREQUENCY (Yrs) <br />1f) <br />/O <br />/00 <br />/00 <br />/0 <br />/0 <br />/O <br />/O <br />/O <br />/O <br />/00 <br />/00 <br />/0 <br />/O <br />/O <br />/00 <br />/00 <br />DESIGN Q (CFS) <br />4- <br />//3 <br />372 <br />2/6 <br />4 <br />/9 <br />77 <br />65 <br />40 <br />30 <br />20 <br />58 <br />/6 <br />72 <br />1­2 <br />86 <br />72 <br />z <br />2 <br />2 <br />4 <br />3 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />Z <br />2 <br />2 <br />2 <br />B <br />r <br />4 <br />/0 <br />/0 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />41 <br />¢ <br />¢ <br />SLOPE (Ft /Ft) <br />.0/ <br />0075 <br />.005 <br />.007 <br />,0/ <br />•007 <br />•0/ <br />10/ <br />•0/ <br />.005 <br />005 <br />005 <br />1003 <br />•005 <br />O/ <br />005 <br />.005 <br />D (Ft) <br />9 <br />2.6 <br />3.3 <br />2.5 <br />9 <br />14 <br />2.0 <br />1.9 <br />1.6 <br />48 <br />1.6 <br />2.2 <br />/.8 <br />2.4 <br />/.6 <br />Z•6 <br />2.4 <br />VELOCITY (FPS) <br />/• 8 <br />4.7 <br />4.9 <br />5.0 <br />/.8 <br />2, 0 <br />4 s <br />4.3 <br />3.4 <br />Z.3 <br />/8 <br />3.0 <br />/4 <br />3.� <br />64.6 <br />3.6 <br />3.4 <br />(a) The, upper reach of Ditch B -1• and the lower reaches of Ditches 1-2 and N-2 will require riprap. <br />Ill Refereaoe KERR MINE AREA SURFACE WATER HYDRROLOOY (KCC MAP le) <br />(c) Revised FI Ditch Designs can be found on Map 23 -I, "Pond and Ditch Design Map ". <br />EMERGENCY SPILLWAY DETAIL <br />yFREEBOARD <br />I I <br />4 DESIGN DEPTH 4 <br />SCALES Ht 111 =51 <br />V• III= 2r <br />i<--CREST LENGTH - -�; <br />Note: <br />Ditches HI,II ,I2, I3, KI, MI, NI, N2, and I4 have been <br />superseded and are obsolete. <br />Ponds H,I, J, K, L,M, and N have been <br />superseded and are obsolete. <br />Refer to map 23 -I, Ditch and Pond Design Map, for <br />revised ditch and pond designs. <br />-� RIPRAP <br />ON 6" GRAVEL BASE <br />Permit Number (.' (`7 O 0 - 006 - <br />Class: pwermit 11 /,, <br />SectionlExhibit: � /I_.._._ ✓� ----- -'- <br />li Class. ❑Revision <br />TYPe'Seq___._- ___._._. ___._.___._.- .___.- ._.__ -._ - - - <br />Class'. 0 Report ❑Hydro OGeneral <br />DOC Type: <br />I7Application (Coal only) ❑Bond ❑ Enforcement Inspection <br />RE <br />REVISIONS KERR COAL COMPANY SEP 0 s )99) <br />/'Nk <br />8/21/80 P L A T E I Mined Land <br />6 r. OF EXHIBIT 29 <br />Reclamation Division <br />6/19/ac <br />POND a DITCH SEDIMENTATION PONDS <br />i <br />0 Q �. SCHEDULES _ - <br />Pand'3hetl� r e, KERR COAL MINE <br />-. <br />r Por" Emb^np' °•'nt Scotioo <br />irilp••M <br />DESIGNED <br />- LHB,GWF <br />TRACED HN <br />we Leonard Rice Consulting Water Engineers. Inc CHECKED LHB <br />8/89 Denver <br />Notes: Trash... Ditt:hes... .we Ro 477EFC01 I 4 -15 -1980 1 <br />