My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110648
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:23 PM
Creation date
11/24/2007 7:54:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
4/24/2000
Doc Name
RESPONSE TO SECOND ADEQUACY LETTER DATED APRIL 5 2000 FN M-1999-117
From
COLO GRAVEL PRODUCTS INC
To
DNR
Section_Exhibit Name
EXHIBIT D MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ` ~- III IIIIIIIIIIIII III <br />Colorado srollol Produc~nc. <br />45247 Hwy. 112 <br />Center, Colorado 81125 <br />Phone (719}754-2738 :f <br />Phone (719}754-2744 pf ~ k'~i°~.'~'`!=~ R~cei~~'''~`~;,, <br />Fax (719) 754-2745 , `~ '- ~ vs ~ r~ <~ ` - 1 ~°" ~ ~(i r9 <br />r_- r <br />.- ~ tQ~ y~;~.,e= ~'~''~"~ {b~~. ~ c ~p`~~,+~2000 <br />April 18, 2000 c,{t' .•Gel j9(yrade~l ~v°A""i5'';S~'2ngo /'IO~i~~r,Pn/~,4. <br />Leo/pg~, <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Re: Response to Second Adequacy Letter dated Apri15, 2000 File M-1999-117. <br />Exhibit D -Mining Plan <br />We will mine in the following sequence using the phase numbers as reference to mining in a <br />particulaz order. Mining will start in phase one, then phase two, phase three, phase five, moving <br />yazd azea to phase six, mining phase four, phase seven, phase six, and phase eight, phase six and <br />phase eight will share yazd azeas, limiting total disturbed areas to twenty three acres plus five <br />acres for portable hatching equipment for a total of twenty eight disturbed acres. <br />We will use a dozer to mine and slope all sides to a 3:1 slope, as mining progresses. We plan to <br />use loaders to mine all middle areas. Due to the cost of mining and material handling, I feel it is <br />necessary to bond for a high wall 500' in length and 20' in height. <br />It is our plan to periodically place portable asphalt and concrete batch plants on this property. At <br />this time we will place these portable plants in phase six. If in the future we decide to place a <br />permanent plant at this site it will be placed in phase six. We feel it is necessary to increase our <br />disturbed azea to twenty eight acres allowing five acres for the placement of portable hatching <br />equipment. If and when we place any permanent equipment at this site, we will file a technical <br />revision informing the division of all necessary information regazding concrete footings, concrete <br />slabs, and column sizes, and increase any necessary bonding. All equipment to be placed at this <br />site have attached Colorado Dept of Health Air Pollution Control Permits. We will file all <br />relocation notices upon approval of our reclamation perntit. <br />The scale will be a 80' pit scale with 12' x 20' x 6" concrete approaches. Upon demolition of the <br />house we will build a temporary 8'x 8' insulated scale house with 2"x 4"walls, metal siding and <br />metal roof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.