Laserfiche WebLink
• III IIIIIIIIIIIII III j <br />STATE OF COLORADO <br />DIV{SION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, Colorado 8020) <br />Phone: (303) 866-3557 <br />FAY: 13031 832-8105 <br />January 12, 2001 <br />Mr. Norm Roche <br />Aggregate Industries, Inc. <br />3605 S. Teller St. <br />Lakewood, CO 80235 <br />Re: Milliken Site, M-2000-087, Permit Issuance -Construction Material Operation <br />Dear Mr. Roche: <br />~~ <br />DIVISION OI <br />MINERAL <br />GEOLOGY <br />R E C L A M A T I O N <br />MINING•SAFETY <br />Bill Owens <br />Covemor <br />Greg E bValcher <br />Executive Dlreaor <br />Michael B. Long <br />Damon Director <br />On January 12, 2001 the Division of Minerals and Geology found Aggregate Industries, Inc. to have satisfied the <br />applicable requirements of C.R,S. 34-32.5-101 et ~. for obtaining a mining and reclamation permit. Therefore, <br />a permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for our <br />files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of the <br />permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes m the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consuhing the Construction Materials Rules and Regulations <br />and(or contacting us to determine if a revision to the permit is necessary. Rule 1. ] 0 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, January 12, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $688.00. Please consult the Act, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the cgntact the Division. <br />Sincerely <br />MICHAEL B. <br />Division Director <br />MBL/I'AS/bdc <br />Enclosure <br />cc: Danua Ortiz, Rocky Mountain Consuhants, Inc. <br />