Laserfiche WebLink
+ III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />OFFICE OF 7HE STATE ENGINEER - <br />pF Cp~O <br />Division of Water Resources ~s;_ - .~ <br />Department of Natural Resources RECEIVED N<j ~b <br />1313 Sherman Street, Room 818 '*+a <br />Denver, Colorado 80203 FEB 2 9 2000 •,8,6 <br />Phone: 1303) 866-3581 <br />FAY: (303) 866-3589 <br />Division of Minerab 8 Geology Rill Owens <br />Governor <br />hep!/watersiaie.co.us/deiau It.htm <br />Greg E Watcher <br />Response to Reclamation Perniit Application Consideration Etenaive Director <br />Hal D. Simpmn, P.E. <br />Slade Enplnee~ <br />DATE: March 1, 2000 <br />TO: Car] B. Mount, Senior Environmental Protection Specialist <br />CC: Division 5 Office, District 36 Water Commissioner <br />FROM: Jeff Deatherage, P.E. ~~ <br />RE: Yust RanchGravel Pi[, File No. M-2000-014 <br />Operator: Yust Ranch, <br />Contact: Jetty Carpenter (970) 724-9325 <br />Section 19, Twp 1 North, Rng 80 West, 6th P.M., Grand County <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume water by: ^ evaporation, ^ dust control, ^reclama[ion, ^ <br />water removed in [he mined product, ®processing, ^ other:. <br />All process water must be diverted in priority wider a water right decreed for such industrial <br />purposes, or prior to initiation of these uses of water, [he applicant will need to obtain either an <br />approved water supply plan or decreed plan for augmentation. <br />^ Prior to approving a well permit, the applicant must conduct a Yield inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the pennit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: If stonnwater runoff is intercepted by this operation, and is not diverted or captured in <br />priority, it must be released to the stream system within 3 days. This may require a discharge permit from <br />CDPHE-WQCD. Otherwise the operator will need to make replacements for evaporation. The applicant <br />may contact the State Engineer's Office with any questions. <br />