Laserfiche WebLink
~II II~II~~I~I~~~ ~~~ <br />STATE OF <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Na[ural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorerla 80201 <br />Phone: (3031 866-3581 <br />FAX: 13031 866-3589 <br />hep J/walerstate.co.us/de(au It.htm <br />~5 <br />RADO <br />MAY 18 1999 <br />,:to9Y <br />pivision of ntrl,a:..: - ... <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 3 Water Commissioner <br />FROM: Megan Sullivan, Water Resource Engineer (~ <br />DATE: May 18, 1999 <br />RE: Timnath Connell Pit, File No. M-99-050 <br />Section 3 Twp 6 N, Rng 68 W, 6th P.M., Lorimer County <br />Operator: Connell Resources <br />Contact: Richard Connell, President, Connell Resources <br />4305 E. Harmony Rd., Ft. Collins, CO 80525 <br />(970)223-3151 <br />.~ o`' eO <br />~.~ ~~ <br />N R <br />Bill Os. ens <br />Governor <br />Greg E. lYalchcr <br />Ezecwire Director <br />Hal D. Simpson, P.E <br />Seale Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />