Laserfiche WebLink
PLAN VIEW OF WATER TREATMENT PLANT EOUIPMENT - SCHWARTZWALDER MINE <br />CONTROL ROOM <br />3'x4'HIGH FRP <br />SEPARKN TANK <br />L41NE WATER AND <br />RECYCLED SORTING STORAGE AREA <br />PLANT WATER ( SEPARAN, FERRIC SULFATE, BARIUM CHLORIDE, <br />LIME, CHLORINE AND SPARE PARTS.) <br />3SULFATE <br />WATER <br />TREATMENT <br />BUILDING <br />1 620 GPM <br />(MAXIMUM <br />DRDE FLOW) <br />CHLORINE <br />I � lulalu�mamurrmunnw <br />- - - 20531 <br />9x7 HIGH STEEL <br />8'x4' HIGH FRP _ <br />LIME TANK <br />DISCHAIjGE <br />TO <br />81 POND <br />FIGURE D-5 <br />