Laserfiche WebLink
II ~„ ~- -- <br />~IIIII~I~'ll~~~~ll <br />sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />D„~.n ^nenl nl Natural RC-SOp4eo <br />Ill 1 Sherman St . Ruom ?1 S <br />Denver, COlurddu 8U?D3 DIVISION O F <br />Fhone: Host Ar,n.3,r,~ ~ MINERAL 5 <br />tAt: rsusl xs~-elor, & <br />GEOLOGY <br />REC LA MA710N <br />MINING•SAf ETY <br />Bill O.~ero <br />May 26, 1999 Governor <br />Greg E. Walther <br />taecmn~e Dveaor <br />Mr. Pete Aragon Michael e, tn~g <br />Lincoln COUnIy Division D~reuar <br />103 3rd Street <br />P.O. Box 39 <br />Hugo, CO 80821 <br />RE: C & D Farms No. 2, M-99-043, Permit Issuance -County Construction Material Operation <br />Dear Mr. Aragon: <br />On May 11, 1999 the Division of Minerals and Geology found Lincoln County to have satisfied the applicable <br />requirements of C.R.S. 34-32.5-101 et seq. for obtaining a mining and reclamation permit. Therefore, a <br />permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for <br />our files and are enL:losing one copy for your use. It is your responsibility to comply with all of the terms of <br />the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all <br />of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy <br />of the permit and the permit application at ate mining operation as a reference for operating personnel, to help <br />ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, May 11, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $225.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual repott requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Since <br />MICHAEL B. G <br />Division Director -" <br />MBL/AJW/SME <br />Enclosure <br />