Laserfiche WebLink
<br /> <br /> <br /> <br />ole <br />6 Geotech Holes <br />Total Lineal Feet M R-72 <br />Reclaim Road &Geotech Holes <br />6" Open Holes <br />Track Mounted Rig <br />Hole De th <br />300 <br />300 <br />Reclamation Estimate <br />Item Quantit Unit Unit Price Total <br />Bottom Plu 0 Each $144.80 $0.00 <br />7' Cement in each hole 6 Bags $8.25 $49.50 <br />Cut Casing at Surface 0 LF $11.40 $0.00 <br />Borehole Marker 6 Each $3.56 $21.36 <br />Drill Rig Time - Re lace Cuttin s -Set Plug 23 Hour $120.00 $2,760.00 <br />Water Truck Time 0 Hour $41.55 $0.00 <br />Reclaim 1.1 Miles of Road 0 LS $7,000.00 $0.00 <br />Replace To soil on Roads 0 CY $2.75 $0.00 <br />Vegetation 0 Acre 2100 $0.00 <br /> <br />Subtotal $2,830.86 <br /> <br />Burden 15% $424.63 <br /> <br />Total Reclamation Estimate $3,255 <br />/$ 2-7~ <br />/iPP~ov~~ <br />!1/z i/a( <br />