Laserfiche WebLink
III ~II~II~I~~~~I~II ~ OEC ' .1991 <br />999 <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 666-3567 <br />FA X: 303 832-8106 <br />DATE: December 16, 1991 <br />T0: Roland G. Obeying <br />FROM: James C. Stevens, Reclamation Specialist <br />RE: File No. M-91-062, Adequacy Items <br />~OF~Cpy~ <br />ti ij" ~o~ <br />:~$ <br />~ re76 ~ <br />Roy Romer, <br />Governor <br />Fretl R. Banta, <br />Division Director <br />The following items must be addressed by the applicant in order to s~tttsfy the <br />applicable requirements of C.R.S. 34-32-101 et seg• and the Mineral Rules and <br />Regulations of the Mined Land Reclamation Board: <br />Notice Reouirements: Currently the applicant has not provided proof of <br />publication of public notice (Rule 3.2<3)<b)(tif). <br />The applicant has not provided proof of receipt of notices to owners of land <br />affected (Larry Laughrey) and owners of land within 200 feet of boundaries of <br />affected land (Rule 3.2(3)(b)<v). <br />Exhibit B <br />Item 2: There is no listing of the permanent man-made structures and <br />their ownership, only reference to locations of such structures on <br />Maps E-1 and E-2 where land ownership is indicated. Provide narrative <br />stating that ownership of structures (including sawmill) is tf~e same, <br />if it is, as the surface ownership indicated on map. (The sawmill <br />could be owned by Tiger Timber could it not?) <br />Exhibit C <br />Item 2: The Division understands from page 2 under this exhit~it that <br />two inches of topsoil is salvageable, therefore any topsoil t-fo Inches <br />or thicker will be salvaged and stockpiled for subsequent use. If this <br />is not intended, please advise. <br />Item 7: The dimensions of existing access road within the permit area <br />have not been provided nor those of the road inside and along east <br />margin of the proposed permit area. Presumably these will be used <br />during mining and reclamation activities and so should be described in <br />the narrative. Also include descriptions of any improvements intended <br />to these roads. <br />