My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106577
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:15 PM
Creation date
11/24/2007 1:57:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
3/30/2005
Doc Name
5 of 7 Mining Landscape Plan
From
Civil Resources
To
DMG
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAIL 4 � <br />I i <br />i <br />UQTE: SET ROOT BALL OF ALL TREES 4" ABOVE <br />GRADE IN IRRIGATED AREAS AND AT GRADE TO 2" <br />ABOVE GRADE IN NON- IRRIGATED AREAS. MODIFY <br />IF SOIL CONDITIONS WARRANT & PER CITY <br />DIRECTION. INSTALL A 5" HIGH BERM AROUND <br />TREES TO CREATE A WATERING BASIN. BERM IS <br />TEMPORARY IN IRRIGATED AREAS. REMOVE BERM <br />AFTER TWO THOROUGH WATERINGS IN IRRIGATED <br />AREAS & MULCH. LEAVE BERM & MULCH IN <br />NON - IRRIGATED AREAS & IN AREAS ONLY <br />IRRIGATED BY DRIP SYSTEMS AFTER DRYLAND <br />GRASS ESTABLISHMENT PERIOD. <br />4" DEEP WOOD CHIP MULCH FLUSH <br />WITH SOD AT EDGE. & TO BE KEPT 2 <br />FROM TRUNK. <br />ALTERNATE CONIFER GUYING SYSTEM: <br />EQUALLY SPACED 30" STEEL STAKES WI <br />WHITE TOPS, SET FLUSH WITH GRADE. GUY <br />TO MID -POINT OF TREE & FLAG WIRE WITH <br />1/2" DIAMETER WHITE PVC PIPE. <br />REMOVE BOTTOM 1/3 OF WIRE BASKET. SET TREE <br />IN PIT TO PROPER GRADE AND PLUMB. REMOVE <br />REMAINING WIRE & TWINE. IF PLASTIC OR TREATED <br />BURLAP, REMOVE AS MUCH AS POSSIBLE & <br />BACKFlLL IF REGULAR BURLAP, BACKFlLL 2/3 OF <br />PIT, REMOVE TOP 1/3 OF BURLAP & COMPLETE <br />BACKFlLL <br />UNDISTURBED S011 <br />DIAMETER 2 <br />BALL WIDTH <br />1:1 (TYP.) <br />DO NOT PRUNE OR DAMAGE <br />CENTRAL LEADER. <br />WRAP TRUNK FROM GROUND <br />LEVEL TO SECOND BRANCH WITH <br />4" KRAFT TYPE TREE WRAP. <br />'a SECURE ENDS WITH FLEXIBLE <br />TAPE. <br />STANDARD GUYING SYSTEM: (ONLY WHERE <br />NECESSARY) MIN. 6' LONG HEAVY DUTY <br />T -BAR STEEL POST STAKES WITH WHITE <br />T -POST CAPS AND WITH 17 GAUGE <br />GALVANIZED STEEL WIRE GUYS SECURED TO <br />TREE WITH CANVAS STRAP ABOVE FIRST <br />BRANCH. WIRE TO BE TAUT BUT NOT OVEIR- <br />TIGHT. FLAG WIRE WITH WHITE PLASTIC <br />FLAGGING TAPE. CONIFERS TO HAVE 2 STAKES <br />FOR TREES 6' AND LESS, 3 STAKES FOR <br />TREES ABOVE 6'. DECIDUOUS TREES TO HAVE <br />2 STAKES FOR TREES 2 -1/2" CAL AND LESS, <br />3 STAKES ABOVE 2 -1/2" CAL. ONE STANCE <br />ALWAYS IN DIRECTION OF PREVAILING WINDS. <br />II _ REMOVE STAKES & GUYS AFTER 1 SEASON. <br />PREPARED BACKFlLL MIXTURE: <br />I 1. ONE PART COMPOST OR <br />VIII I APPROVED EQUAL <br />= ln= in =nl= III -u' 2. TWO PARTS TOPSOIL <br />3. THREE PARTS NATIVE SOIL <br />4. MATERIALS TO BE THOROUGHLY <br />BLENDED. <br />NOT TO SCALE <br />MINING LANDSCAPE NOTES: <br />1. ALL PROPOSED LANDSCAPING SHALL BE IRRIGATED WITH AN IRRIGATION SYSTEM. AREAS PLANTED WITH THE <br />SPECIFIED SEED MIX SHALL BE IRRIGATED UNTIL ESTABLISHED. <br />2. ALL TREES SHALL HAVE 3' DIAMETER TREE WELLS. SHRUBS AND TREES TO BE MULCHED WITH WOOD MULCH IN 4" <br />MINIMUM DEEP BEDS TO FACILITATE MOWING UNTIL TREES AND SHRUBS ARE WELL ESTABLISHED, <br />3- LOCATION OF LANDSCAPE MATERIAL WILL BE SUBJECT TO FIELD ADJUSTMENT TO ACCOMMODATE ANY FIXED <br />IMPROVEMENTS AND SITE CONDITIONS. <br />4. ALL LANDSCAPING SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREES CANNOT BE PLANTED WITHIN 5' OF A <br />UTILITY LINE. <br />5. THE LANDSCAPE CONTRACTOR SHALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE LOCATION OF ALL <br />UNDERGROUND UTILITIES. <br />6. ALL LANDSCAPE SHALL BE INSTALLED CONSISTENT WITH XERISCAPE STANDARDS FOR INSTALLATION, SOIL PREPARATION <br />AND IRRIGATION. <br />7. ALL SEEDED LANDSCAPE AREAS SHALL BE RESEEDED AS NEEDED UNTIL WELL ESTABLISHED. <br />8. TREES AND SHRUBS PLANTED WITHIN MULCHED BEDS WITHOUT EDGING SHALL BE DRIP IRRIGATED. MULCHED BEDS <br />SHALL NOT BE MAINTAINED ONCE TREES AND SHRUBS HAVE BEEN ESTABLISHED OR BEYOND 5 YEARS. NATIVE <br />GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHED BEDS AFTER ESTABLISHMENT. <br />9. ALL TREES AND SHRBS SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HALL WALL.. <br />10. TREES AND SHRUBS SHALL BE PLANTED AT THE AMOUNTS LISTED ON THE PLANT SCHEDULE. TREES AND SHRUBS <br />SHALL BE CLUSTERED AS SHOWN ON THE PLAN. <br />11. ALL SUSTITUTIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO PLANTING. PROPOSED SUBSTITUTIONS <br />MUST BE NATIVE AND WILL ONLY BE ACCEPTED BASED ON AVAILABILTY. <br />12. TEMPORARY STOCKPILES THAT ARE NOT DISTURBED REGULARLY WILL BE SEEDED WITH LUNA PUBESCENT WHEATGRASS <br />AND /OR AMUR IMMEDIATE WHEATGRASS AT A RATE OF 15LBS PLS /ACRE, WITHIN 45 DAYS, WEATHER PERMITTING. <br />13. SEEDINGS OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL GRADING AND REPLACEMENT OF TOPSOIL <br />HAVE BEEN COMPLETED FOR EACH PHASE. <br />14. FORBS SPECIES LISTED IN THE SEED SCHEDULE SHALL BE ADDED TO THE SEED MIX WHEN SEEDING BERMS AND AREAS <br />ADJACENT TO THE TRAILS AND ADJACENT HOMES. <br />15. SEEDING RATES SHALL BE DOUBLED WHEN SEED MIX IS HAND- BROADCAST. <br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE SEPTEMBER AND MID -APRIL TO ASSURE ADEQUATE SITE CONDITIONS FOR <br />GERMINATION. SEEDING SHALL BE DONE IN UN- FROZEN SOIL. <br />17. REVEGETATED AREAS WILL BE MULCHED WITH CLEAN, WEED -FREE STRAW OR NATIVE HAY. HAY SHALL BE APPLIED <br />AT A RATE OF 4,000 LBS /ACRE AND CRIMPED INTO THE SOIL <br />18. CRIMPING WILL BE DONE ALONG THE CONTOUR. <br />25' <br />SETBACK <br />PRUNE DEAD OR DAMAGED <br />BRANCHES PRIOR TO PLANTING. <br />IF FORM IS COMPROMISED BY <br />PRUNING, REPLACE SHRUB. <br />SPACE PLANTS AND SET PLUMB <br />FOR BEST EFFECT, <br />MOUND COMPACTED BACKFlLL <br />UNDER ROOTBALL OR <br />SET ON UNDISTURBED SOIL. <br />REMOVE ALL CONTAINERS, BASKETS, <br />WIRE ETC. FROM ROOT13ALL <br />i <br />c� <br />c� <br />HIGHWAY 85 <br />1:1 (TYP.) <br />r NCEPTUAL <br />PLAN <br />DIAMETER <br />2 -3 X'S BALL WIDTH <br />PLANT SCHEDULE <br />Common Name <br />Botanical Name <br />Qty <br />Planting Size <br />EVERGREEN TREES - 118 TOTAL: <br />Total Ibs PLS /Acre <br />GRASSES: <br />Rocky Mountain Juniper <br />Juniperus scopulorum <br />16 <br />6' BdcB <br />Ponderosa Pine <br />Pinus onderosa <br />35 <br />6' B &B <br />Bristlecone Pine <br />Pinus oristada <br />20 <br />6' B&B <br />Pin n Pine <br />Pinus cembroydes edulis <br />22 <br />6 B&B <br />Colorado S ruce <br />Picea Pun ens <br />25 <br />6' BdcB <br />DECIDUOUS TREES - 67 TOTAL <br />Green Ash <br />Honeylocust <br />Western Catalpa <br />Hackberry <br />Fraxinus pennsytvanica <br />Gleditsio triacanthas inermi <br />Catalpa specioso <br />Celitus occidentalis <br />15 <br />22 <br />15 <br />15 <br />2' CALIPER <br />2" CALIPER <br />2" CALIPER <br />2" CALIPER <br />LARGE SHRUBS - 416 TOTAL• <br />Schizach ium sc arium <br />Mountain Mahogany <br />Cercocarpus montanus <br />85 <br />5 GALLON <br />Thinleaf Alder <br />Alnus incona ssp. tenuifolia <br />85 <br />5 GALLON <br />Smooth Sumac <br />Chokecherry <br />Gambel Oak <br />Rhus glabra <br />Prunus virginiona <br />Quercus gambrelli <br />112 <br />85 <br />85 <br />5 GALLON <br />5 GALLON <br />5 GALLON <br />SMALL SHRUBS - 574 TOTAL <br />IBuffaloberry <br />Antelope bitterbush <br />She erdia canadensis <br />Purshio tridentata <br />56 <br />56 <br />5 GALLON <br />5 GALLON <br />'Golden Current <br />(Plains Yucca <br />Mlinebark <br />Rabbitbrush <br />Sand Cherry <br />Shrubby cinquefoil <br />Ribes aureum <br />Yucca glauca <br />Psycocorpus monogynus <br />Chrysathamnus nauseousus <br />Prunus pumila ssp. besseyi <br />Potentilla fruiticosa <br />56 <br />56 <br />56 <br />56 <br />56 <br />56 <br />5 GALLON <br />5 GALLON <br />5 GALLON <br />5 GALLON <br />5 GALLON <br />5 GALLON <br />51`ee- leaved Sumac <br />Rhus aromatica ssp. trllobat <br />126 <br />5 GALLON <br />SET SHRUB PLUMB. <br />TOP OF ROOT BALL TO <br />MATCH FINISH GRADE <br />3" DEEP SHREADED CEDAR MULCH <br />INSIDE SAUCER FOR ALL SHRUBS <br />PREPARED BACKFlLL MIXTURE <br />1. ONE PART COMPOST <br />OR APPROVED EQUAL <br />2. TWO PARTS TOPSOIL <br />3. THREE PARTS NAVE SIL. <br />4. MATERIALS TO BEnTHHOROUGHLY <br />BLENDED. <br />SEED WITH SPECIFIED NATIVE <br />GRASS MIX AND & WATER TO <br />ESTABLISH <br />3 MIN 3 MIN <br />EXISTING GRADE <br />VARIES I <br />TYPICAL - TEMPORARY MINING BERM CROSS SECTION <br />NOT TO SCALE <br />SEED SCHEDULE <br />Scientific Name <br />Common Name <br />Variety <br />100% PLS /Acre <br />% of Mix <br />Total Ibs PLS /Acre <br />GRASSES: <br />1' CONTOURS <br />0 <br />EXISTING <br />POWER POLE <br />-E- <br />Pasco m smithii <br />Western Wheat rass <br />Arriba <br />16.00 <br />15X <br />2.4 <br />Panicum vir atum <br />Switch rass <br />DMG ADEQUACY RESPONSE <br />4.5 <br />15% <br />0.7 <br />Boutelona racillis <br />Blue Grama <br />Lovin ton <br />Boutelouo curti endula <br />Sideoats Grama <br />Vau hn utte <br />9.0 <br />Schizach ium sc arium <br />Little Bluestein <br />Cimarron Cam <br />7.0 <br />15% <br />15% <br />1.35 <br />Sti a Viridula <br />Green Needl rass <br />Lodorm <br />10.0 <br />15% <br />1.0 <br />TOTAL <br />1.5 <br />100% <br />7.75 <br />FORBS: <br />Dalea u urea <br />Pu le Prairieclover <br />Atriplex conescens <br />Fourwing Saltbush <br />0.5 <br />Ratb ida columnifera <br />Prairie Coneflower <br />0.5 <br />S haeralcea coccinea <br />Scarlet Globemallow <br />0.5 <br />Penstemon virgatus <br />Little Bluestem <br />0.5 <br />var. asa grayi <br />0.5 <br />25' <br />SETBA K <br />a <br />IF <br />PERMIT BOUNDARY <br />REVISIONS <br />100 YR. <br />FLOODPLAIN <br />- <br />EXISTING <br />WATER <br />--4840- - <br />EXISTING <br />1' CONTOURS <br />0 <br />EXISTING <br />POWER POLE <br />-E- <br />EXISTING <br />OVERHEAD <br />OF <br />POWER <br />FiLUPTON SPECIAL USE <br />-G- <br />EXISTING <br />GAS LINE <br />DMG ADEQUACY RESPONSE <br />GAS MARKER <br />© <br />PETROLEUM WELL <br />LJ <br />GAS /OIL <br />EQUIPMENT <br />REVISIONS <br />EXISTING TREE <br />D EXISTING STRUCTURES <br />HIGH WATER LINE OF <br />RECLAIMED PONDS <br />-x- FENCE <br />10 TELEPHONE PEDESTAL <br />EVERGREEN TREES <br />DECIDUOUS TREES <br />039)2�) LARGE SHRUBS <br />% SMALL SHRUBS <br />North <br />0 50' 100' 200' <br />SCALE: 1"-100' <br />LUPTON LAKES RESOURCE, <br />FT. LUPTON SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />MINING LANDSCAPE PLAN <br />SW TKO JOINT VENTURE PARTNERSHIP, LLC <br />P.O. 4id Oak Street, Suite 209 <br />CIVIL R E SIXU R C E S, LLC <br />P.O Box 680 Frederick, CO 80530 <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: DF ]OB N0. DWG: <br />DATE: SEPT. 2004 <br />DRAWN BY: ARR/SR DMG - Revised for Adequacy Response 3 -25 -05 <br />CHECKED BY: DO SCALE: AS NOTED SHEET: 5 OF 7 <br />Permit #: i,11- J nr y - (r7� Confidental?: /V RECEIVED <br />Class 1 'T -°- Type Se .: <br />From: t as To: vL/ _ MAR ? P 2005 <br />Doc. Name <br />Doc. Date (if no date j'-1 ! ti <br />/, L 0rvismn of rvunerais and Geology <br />DATE <br />BY <br />REVISIONS PER SW TKO <br />11/9/04 <br />DF <br />NAME CHANGE PER DMG <br />12/20/04 <br />OF <br />r4lDESCRIPTION <br />PERMIT N0. CHANGE PER DM <br />1/27/05 <br />OF <br />FiLUPTON SPECIAL USE <br />3/24/05 <br />SR <br />DMG ADEQUACY RESPONSE <br />3/28/05 <br />KF <br />EXISTING TREE <br />D EXISTING STRUCTURES <br />HIGH WATER LINE OF <br />RECLAIMED PONDS <br />-x- FENCE <br />10 TELEPHONE PEDESTAL <br />EVERGREEN TREES <br />DECIDUOUS TREES <br />039)2�) LARGE SHRUBS <br />% SMALL SHRUBS <br />North <br />0 50' 100' 200' <br />SCALE: 1"-100' <br />LUPTON LAKES RESOURCE, <br />FT. LUPTON SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />MINING LANDSCAPE PLAN <br />SW TKO JOINT VENTURE PARTNERSHIP, LLC <br />P.O. 4id Oak Street, Suite 209 <br />CIVIL R E SIXU R C E S, LLC <br />P.O Box 680 Frederick, CO 80530 <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: DF ]OB N0. DWG: <br />DATE: SEPT. 2004 <br />DRAWN BY: ARR/SR DMG - Revised for Adequacy Response 3 -25 -05 <br />CHECKED BY: DO SCALE: AS NOTED SHEET: 5 OF 7 <br />Permit #: i,11- J nr y - (r7� Confidental?: /V RECEIVED <br />Class 1 'T -°- Type Se .: <br />From: t as To: vL/ _ MAR ? P 2005 <br />Doc. Name <br />Doc. Date (if no date j'-1 ! ti <br />/, L 0rvismn of rvunerais and Geology <br />
The URL can be used to link to this page
Your browser does not support the video tag.