Laserfiche WebLink
~~ <br />DIVISION OF MINERALS AND GEOLOGY <br />UeUanmenl of Natural Resources <br />1313 Sherman 51 , Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 R66-3567 <br />FAx (303) 832-8106 <br />March 2, 1995 <br />('T A Tr <br />III IIIIIIIIIIIIIIII F <br />999 <br />COLORADO <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Mr. Paul Banks <br />SHB AGRA Inc. <br />17301 W Colfax Ste 170 <br />Golden, CO 60401 <br />Re: M-93-041, Dowe Flats Mine, Permit Issuance <br />Dear Mr. Banks: <br />Roy Romer <br />Governor <br />lames 5. Lochhrad <br />Evecwive Director <br />M¢hael B. Long <br />Dimswn Oveclw <br />On February 1, 1995, the Division of Minerals and Geology found Southwestern <br />Portland Cement to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et seg. for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, February Ol, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />8550.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />MICHAEL B. LONG <br />~ivision Director <br />Enclosure <br />MBL/WCY/amm/1056G <br />