My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106284
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:02 PM
Creation date
11/24/2007 1:32:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
3/4/2002
Doc Name
MCCs Adequacy Response Letter
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR94
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MOUNTAIN COAL <br />~~ COMPANY~.~.~. <br />A Subsidiary ofArth Weslem Resources, LLC <br />iiiiiiiiiiiiii~iiii <br />999 <br />West Elk Mine <br />P O Bax 591 <br />5174 Highway 133 <br />Somenel,CO 81434 <br />(970)929-5015 <br />Fax (970)929-5595 <br />October 12, 2001 <br />Mr. James Burnell <br />Colorado Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECE-VED <br />®CS 1 ~ 2001 <br />~pp Ot Mirtgtals & Geu~c9Y <br />Re: Mountain Coal Company LLC (MCC), West Elk Mine; Permit No. C-SO-007; Technical <br />Revision No. 94 (TR-94), MCC Responses to the Division's Adequacy Review of 5 October <br />2001 <br />Dear Mr. Burnell, <br />Mountain Coal Company, L.L.C. is submitting these responses to the Division's adequacy review dated <br />5 October 2001, regazding additional Gob Vent De-Gas Borehole Pads and Drill Holes Nos. 15-O1, 15- <br />02, IS-03, 15-3.5, IS-O5, and Access. Attached are the updated schedule, and the SEDCAD <br />designations for all of the proposed drill pads. <br />(1) The updated schedule (attached) shows the schedule as it relates [o the United States Forest <br />Service (USFS) Enviromnental Assessment process. <br />(2) MCC agrees with the Division's calculations for the reclamation bond in the amount of <br />$ l 14,861.00. <br />(3) Drill Pads Nos. 15-01, 15-02, 15-03, 15-3.5, and 15-OS will have the 1.0 acre SEDCAD typical <br />analysis applied [o each of the pads. <br />The project occurs on MCC's existing Federal Coal Leases and the Gunnison National Forest. As <br />such, MCC requested permission from the United Stales Forest Service (USFS) to conduct this project <br />for the remaining Gob Vent De-Gas Boreholes in Longwall Panel 15. The application was submitted <br />to the USFS on September 7, 2001. It is expected that the USFS could approve the expedited <br />Environmental Analysis (EA) either Friday [he 19`h or Saturday the 20'h of October for [his project. <br />As a result of these adequacy responses it would be our fervent hope that the CDMG would be able to <br />grant approval by October 20, 2001, concurrently with the USFS approval. <br />Approval of the revision is necessary and prudent for us to continue methane drainage for the safety <br />and well-being of MCC's workforce and meet the timing requirements of mining Longwall Panel 15. <br />
The URL can be used to link to this page
Your browser does not support the video tag.