Laserfiche WebLink
r <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER oe co~~ <br />Division of Water Resources ~ ~CR'~~1~/L® r~sD Q~y, <br />Department o! Natural Resources G lr i P! b ye p~~~u~1}} ~' 00 <br />1313 Sherman Street, Room 818 ~~(~ ~~ ` ~4.~ <br />Denver, Colorado 80203 1AUV 2 ~ ZVUL ~r r9v6 !`i <br />Phone (303) 866-3561 -- <br />FAX (303) 866-3589 <br />www.watecstate.co.us Division of Minerals and Geolapy Bill Owens <br />Governor <br />Greg E. Wal<her <br />xecutive Director <br />Response to Reclamation Permit Application Consideration Hal D. Simpson, P.E. <br />Stale Engineer <br />TO: Carl B. Mount, Senior Environmental Protection Specialist r/ <br />CC: Division 5 Office; District 72 Water Commissioner <br />FROM: Claudia Engelmann, Water Resources Engineer/G~i <br />DATE: November 22, 2002 <br />RE: 15 Road Pit, File No. M-2002-114 i~ <br />Section 12, Twp 1 N, Rng 3 W, Ute P.M., Mesa County <br />Operator: Oldcastle SW Group, Inc. dba United Companies of Mesa County <br />Contact: Pete Siegmund, Vice President <br />Oldcastle SW Group, Inc. dba United Companies of Mesa County <br />2273 River Rd. <br />PO Box 3609 <br />Grand Junction, CO 81502 <br />(970) 243-4900 <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, <br />reclamation, ®water removed in the mined product, ®processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required in over- <br />appropriated areas. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />® The proposed operation may have potential impact on existing water rights near the project <br />location. Please provide evidence that the proposed project will not alter or impact the <br />historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for: ^ uses at the permit site, ^ <br />storage in the excavated area(s), ^ other: The applicant will need to provide <br />evidence to this office that the water is permitted or decreed for such uses. <br />^ Other; <br />COMMENTS/NOTES <br />