Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY ~-- <br />Department of Natural Resources <br />1313 Sherman St., Room 275 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX; (303) 832-8706 <br />March 13, 2007 <br />Mr. Mike Refer <br />i <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Ritter, lr. <br />Governor <br />Harris D. Sherman <br />Ezttutive DIfMOr <br />Aggregate Industries -WCR, Inc. ..~ Ronald w. cottony <br />1707 Cole Blvd., ate. IOO Division Director <br />GOlderi, CO 80401 Natural Resource Trustee <br />C/~ c'_ <br />Re: Tucson South Resource, Permit No. M-2004044, Permit Issuance -Construction Material Operation <br />Dear Mr. Refer: <br />On February 5, 2007 the Division of Reclamation, Mining and Safety found Aggregate Industries -WCR, Inc. to have <br />satisfied the applicable requirements of C,R.S.34-32.5-101 et seq. for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for <br />our files and are enclosing one copy for your use. It is your responsibility to comply with all of the teens of the permit. <br />1. All of the original applicafion materials, as amended and supplemented, aze an integral part of your pemtit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit <br />application at the mining operation as a reference for operating personnel, to help ensure compliance with the terms of the <br />permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may require a <br />modification to the permit. We suggest consulting the Construction Materials Rules and Regulations and/or contacting us <br />to determine if a revision to the pem3it is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical Revisions, <br />and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, Febntary 5, you must submit an annual fee and an annual report to us. <br />The annual fee for this permit is $688.00. Please consult the Act, Rules and Regulations, and your permit for specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />cer , <br />~~ ~~sZ~~ <br />RONALD W. CATTANY <br />Division Director <br />RWC/AJW/ets <br />Enclosure <br />cc: Barb Brunk, Tetra Tech RMC, Inc. <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />