Laserfiche WebLink
ccvovv <br />GRAPHIC SCALE <br />zoo o loo zoo aoo <br />( IN FEET ) <br />1 inch = 200 ft. <br />CONTROUR INTERVAL = 5' <br />�, / . <br />„ � INITIAL RECOVERY TO CONSTRUCT <br />' CLARIFICATION BASIN <br />\ � SUMP /CLARIFICATION BASIN <br />"� (SEE NOTE 5) <br />�, � COFFERDAM OR OTHER TEMPORARY <br />��� � � IMPERMEABLEBARRIER <br />MINING SCHEDULE <br />SECTION LINE <br />ACREAGE <br />1.72 <br />PROPERTY LINE <br />-- - -- - <br />_ EASEMENT /ROW <br />C <br />� PROPOSED EASEMENT <br />2.50 <br />PAVED ROAD <br />16.86 <br />------- - - - - ---------------- <br />----------------------------- <br />UNPAVED ROAD <br />- - - - - <br />- - DITCH /WATERWAY <br />' ' ` " <br />' ` ^ FLOODPLAIN ZONE A <br />— " ' ' ' <br />FLOODPLAIN ZONE X <br />- , — . , .., -- .- <br />.. — „ - FLOODWAY <br />�� � <br />� �� MIMNG LIMIT /POND BOUNDARY <br />'� <br />� � � PERMIT BOUNDARY <br />EXISTIN6INDEX CONTOUR <br />EXISTING INTERMEDIATE CONTOUR <br />— ` "� — ` "s ` "s — <br />" "' — �s — EXISTING GAS LINE <br />PROPOSED 6A5 UNE <br />— °�*'— °HU— °HU— <br />oHU— oHU EXISTING OVERHEAD UTILITY <br />- <br />- RELOCATED OVERHEAD UTILITY <br />EXISTING PHONE CABLE <br />r � <br />-�-: <br />EXISTING STRUCTURE <br />� .T� `� - j • `�, <br />• ��.�' J JURISDICTIONAL WETLANDS <br />MW <br />MONITORING WELL <br />1 <br />DIRECTION OF MINING <br />GRAPHIC SCALE <br />zoo o loo zoo aoo <br />( IN FEET ) <br />1 inch = 200 ft. <br />CONTROUR INTERVAL = 5' <br />�, / . <br />„ � INITIAL RECOVERY TO CONSTRUCT <br />' CLARIFICATION BASIN <br />\ � SUMP /CLARIFICATION BASIN <br />"� (SEE NOTE 5) <br />�, � COFFERDAM OR OTHER TEMPORARY <br />��� � � IMPERMEABLEBARRIER <br />MINING SCHEDULE <br />PHASE <br />IA <br />ACREAGE <br />1.72 <br />RESERVE (TONS) <br />76,500 <br />YEARS TO MINE* <br />0.10 <br />16 <br />22.42 <br />1,300,300 <br />2.50 <br />2 <br />16.86 <br />829,200 <br />1.75 <br />3A <br />38.19 <br />1,959,600 <br />4,00 <br />3B <br />. ,..-� . <br />24.34 <br />1,262,000 <br />2.75 <br />JCC IVV I C 7 <br />�" � NOTES: <br />��, <br />°' 1. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS SILT COLORADO QUADRANGLE AT 20' CONTOUR INTERVALS IMPhEMENTATION OF CONCURRENT RECLAMATION I5 REQUIRED TO LIMIT NEAR - VERTICAL SLOPES. <br />-I - AND INTERPOLATED AT 5' CONTOUR INTERVALS. <br />9. MINING SCHEDULE ASSUMES MAXIMUM RECOVERY OF DEPOSIT AND 500,000 TONS /YEAR MARKET DEMAND. <br />/ yP �- �\ �.,, _ _ I 2. APPROXIMATE DEPTH OF MINED AREA IS 25 FEET WITH 2.5H:1V SIDE SLOPES. THE OPERATOR WILL MINE TO ACTUAL MARKET CONDITIONS AND MINING SCHEDULE MAY VARY. <br />2.5:1 SLOPES, OR RECOVERY TO NEAR - VERTICAL SLOPES, WHERE PRACTICAL, GIVEN LIMITED OVERBURDEN ND <br />�� d, � _ � _ � . _ _ _ _ . _ - _ LIMITED STOCKPILING FOOTPRINT. OVERBURDEN AND TOPSOIL, MATERIAL USED FOR SCREENING BERMS 10. ASPHALT AND / OR CONCRETE PLANT FACILITIES MAY BE LOCATED IN THE PHASE 1 / 3 PROCESSING AREAS. <br />° , ,,� � <br />' / �"`�' � I DURINfi MINTING WILL BE BACKFILL PLACED ALONG SHORELINE CROSS- SLOPES DURING FINAL RECLAMATION THE PROCESSING AREA MAY ALSO CONTAIN TRUCK PARKING, EQUIPMENT STORAGE, AND OTHER ACCESSORY <br />/ ! / � �T - � ` > � TO ACHIEVE FINAL SLOPES OF 3:1 AND 2:1, AS IDENTIFIED IN THE RECLAMATION PLAN. USES. THIS AREA WILL BE PREPARED BY REMOVING ALL TOPSOIL AND OTHER MATERIALS SUITABLE FOR <br />` � COLORADO FIVER RECLAMATION, REPLACING THE WORKING SURFACE WITH FILL AS NEEDED. <br />�, ' a i 3. PHASE lA MINING TO GENERATE INITIAL SCREENING AND PROVIDE LANDSCAPE /WATER FEATURE AS BUFFER <br />/ �` � � TO EAST. PHASE IA MAY BE LIMITED IN DEPTH OR EXTENT TO SPECIFICALLY MEET THESE FUNCTIONAL Il. FLOODPLAIN AND Fl00DWAY INFORMATION TAKEN fEMA MAP NUMBER 08020510910, REVISED AUGU <br />�, � �- NEEDS. 2,2006. ST <br />a4 - 1 ' �__ � _ ..� <br />� I 4. RESERVE QUALITY. THE PROPERTY CONTAINS RELATIVELY HOMOGENOUS SAND AND NATURAL GRAVEL 12. PRIOR TO ERECTION OF PROCESSING AND PLANT FACILITIES, THE OPERATOR WILL REMOVE TOPSOIL AND <br />/ �. °� \��/ .- - � - z J /i � } � I DEPOSIT ABOVE 25 FEET BELOW GRADE, WITH INTERMINGLED LARGER ROCK. <br />° , �( . _ . � ;�'C `� � � '� � � - .. _ _ ` , `� _ . . � OVERBURDEN FROM THE PROCESSING AREA AND ENSURE (BY IMPORTIIJG OR GENERATING ON -SITE) A SOLID <br />� J � ' 5. DEWATERIN6 ANO RECHARGE. THE SITE WILL BE DRY -MINED OR OTHERWISE DEWATERED TO PROVIDE AVAILALBLE, TOOA DEPTH OF AT LEASTE IXI NCHESOSALVAGED MATERIALS SHALLBBE STOR RED, WHERE <br />� � � <br />/ / {' ` .� � ` � - � ` � � � ® MACHINE ACCESS TO THE AGGREGATE RESOURCE PUMPED WATER WILL BE DIRECTED TO A SUMP AREA AFTER ED IN SCREENING <br />� \ � 25' EM�BANKME)�f AT TOP ( AND BUFFERING BERMS (FOR LOCATION, SEE PLAN) AND PHASE I OVERBURDEN STAGING (SEE PLAN AND NOTE <br />� ,, � `'� ; , .1� � o �� '� - , (3:1 MIN. SIDE SLOPES � I, INITIAL RESOURCE RECOVERY IN SUMP FOOTPRINT AND CONSIRUCIION OF COFFERDAM) FOR CLARIFICATION BELOW). <br />' � �� � - `�' ` AND USE IN WETLAND RECHARGE OR DISCHARGE TO COLORADO RIVER IN ACCORDANCE WITH PERMITS FROM <br />r � � ''' ° 1 ; ' - - - -'� \\\ � \ - . (SEE OTE 14) \ ENVIRONME�ES (E.G. ARMY CORPS OF ENGINEER'S, COLORADO DEPARTMENT OF PUBLIC HEALTH AND 13. PHASE l OVERBURDEN STAGING. NON- TOPSOIL OVERBURDEN TO TH <br />i � � - - - = �\ � � �\ - - - � � PROCESSING AND MINING AREAS, WILL BE STOR E EXTENT PRESENT 7N PHASE 1 <br />NG OFFSET 1 � ° , , � - . _ . _ - - <br />ED IN A TEMPORARY STOCKPILE, AS DEPICTED ON THIS PLAN. <br />\ 6. INTERNAL HAULING. THE OPERATOR WILL COOPERATIVELY USE DEVELOPED GAS ROADS AS INTERNAL ACCESS MININ605IDEISLOPES OR CONCUORRENT RECLAMA�II�ALS TO BE PLACED WITHIN CLARIFICATION BASIN OR <br />OM ROAD (TYP.) / / � \ �1 � - ,\ \\ � I f i _ _ _ _ _ _ _ _ � \ AND HAUL ROUTES, AS APPROPRIATE. ON. THE STOCKPILE WILL BE REMOVED PRIOR TO PHASE i <br />- -. . -. -. 1 ` I -_ <br />` \ MINING ]N THIS AREA. <br />° , ' � \ - I - - - I � . I i \ j(,'' 2� � 7. TOTAL SURFACE AREA SUBJECT TO MINE <br />, i i s <br />D LAND RECLAMATION PERMITTING, AS ILLUSTRATED, IS 163.31 14. SPILLWAYS. RIPRAD- ARMORED SPILLWAYS WILL BE INSTALLED TO ALLOW FOR FII.I -ING OF PIT AREAS PRIOR <br />°' / ° 2 � ' I PHASE 1 B \ �' - +� -- v ___ ACRES. TO FLOOD CRESTING AND METERED OU11ET1IN6 OF FLOODWATERS FROM ACTIVE OR RECLAIMED PITS <br />,.. . \-- ; ; ;:.: ;- I� - - -' - ' MINING AREA '\ - - ", <br />8. CONCURRENT RECLAMATION BASED ON LIMITED OVERBURDEN COVERAGE ON DEPOSIT, THE OPERATOR MAY FOLLOWING THE 100 -YEAR FLOOD. CULVERTS, SIPHONS, AND OTHER STRUCTURES MAY BE USED TO CRO55 <br />' � � HYDROCARBON i - }+ DITCH LATERALS. <br />° / , ' � - - RECOVERY PAD i (22.42 ACRES) `'• MINE TO FINAL RECLAMATION SLOPES. GIVEN AVAILABLE OVERBURDEN FOR CONCURRENT RECLAMATION, THE <br />- � � � \ � OPERATOR MAY ALSO MINE TO NEARLY VERTICAL AND BACKFILL TO FINAL RECLAMATION SLOPE. NO MORE 15. GROUNDWATER MONITORING WELLS SHALL REMAIN INTACT FOR THE DURATION OF MINING. <br />1O � -' / � I � I = - : - ; - ; . = + ; • ; - a. \ \ � .` THAN 1,000 LINEAR FEET OF WORKING FACE WILL EXCEED A STABLE POST - MINING CONFIGURATION BEFORE <br />.° - \ � �. <br />, \ <br />I � � I <br />P � � <br />� � -� � 1� I � '." - _ � i � <br />�h'C ; • ' � ` _ , • - : - ; - ; - ; ; - : `�a ��� ��\ ` + -` I DEWATERING TRENCH <br />�� / ® ` PHASE 3A - - � '� (sEE Deran> <br />Z / ` -� MINING AREA - - - - - � � \ I I <br />+ <br />I / �� � (38.19 ACRES) `:, - _. - - - y, I \ , . -. I <br />/ ` - � � <br />F s �'� � <br />"� PHASE 1 / 2 PROCESSING AREA ' � "- `` <br />� (SEE NOTE 12, APPROX. LIMIT) _ � �� - . i \�� ++ <br />x"11 ;o � / � a <br />° r o � ~/� " .' ` CONCRETE PLANT - i - - � � -� #'� ' � SPILLWAY I <br />/ - , � / � - - (IYP.) " . ' . �, � ��. (SEE NOTE 14) �: <br />'° � � E � ii / \ � �` ASPHALT PLANT - � '' PHASE I OVERBURDEN STAGING <br />/ � 1 Y � (TYP.) - :� - �- (SEE NOTE 13) <br />PRODUCT SORTING !- � I I / <br />25' FROM TOP OF BANK (n'P.) <br />PHASE 3 ASPHALT / � � - -- �y <br />' CONCRETE PLANT AND' `° ` � _ / PROCESS /WASH WATER POND � i L �� <br />- - - - -- _� , h _� <br />� PROCESSING AREA � _ �� —s•s -- 9 —��� . � i� <br />� �� I � ..,. � �_ _ tv� sr5 9jby � s � . <br />` �r <br />/ � 1� .,, (SEE NOTE 12, � � � �- - - -- —� —. - --�— °.u�H —;�. —_ � �d. _ .; (4 <br />' i �' � � APPROX. LIMIT') 25' FROM TOP OF BANK ��� � � � i ti � � 25' �� ` <br />/ i' � " � / � �I /_ _ _ _ __ _ / _ACCESS ROAD AND PROPOSED PIPE OR REALIGN LAST CHANCE <br />I � \ <br />E � � � i PIPELINE EASEMENT DITCH NORTHERN LATERAL <br />� � I'° - / / `- PHASE 3 PROCESSING AkE� \ ✓ � <br />i �F� - � (APPROX. LIMIT) / ' � i FROM POINT OF DIVERSION <br />r 'I - . - } - - - - ' . �, }� EXI NG DRIVE AY TO BE `. � / .. � � � � NYD�iOC� N � <br />11 / �� M NTAINEO TE RARILY, \� _ � jREDOVERYPAD i �' <br />l� � � I - '- - ' - - : - ,! � _ ` NO TRUCK HAUL /USE POR MINING / r i <br />r <br />�I _ a <br />Lj ;jl� '°�,� , -�'� `+ � - \ i i � �� / /./ � °'25'FOR MTOPOFBANK i �� PHASE SA <br />� f l,' , �. I � PHASE 36 / � ' MINING AREA <br />aELOCa � I` . ' �� e � � +` HYDROCaReoN ++ MINING AREA : ^' ; I � i i <br />TED UTILITY i '�_ - -�� ` i� � + ++ RECOVERY PAD ++ `- � (24:34 ACRES) i � � / / % � (SEE NOTE 3 <br />� ,�1 °E ++ �+� � �- _ � i - � <br />N � Ij�� ,+ i •S � / � • / PHASE 2 I � TEMPORARY SCREENING BERA�S- - <br />-1 N I I , 'y + `,, � � 50' STOCKPILE OFFSETi(TYP.) , °Z ' (SEE DETAIL � - - <br />1 ++ ' ' � ^' MINING AREA , �� ) <br />� ' � 1 �, (UNLESS MINED TOSTABLE � � I / (16.86 ACRES) � <br />I it � 1 ' / SUPPORTING SLOE PER DMG) ° ' � i <br />YI ' __ ' � , � �' 200' MINING OFFSET FROM KANCILIA I � '^ - �� <br />li � I I- � / -- ^,� RESIDENCE AND OUTBUILDINGS � � <br />" 1 �,�' �4 v „ i d -_ / _ TEMPORARY SCREENING BERMS ' �' MIN. / `` <br />-' ° `� �' 25' FROM TOP OF BANK i � r _ _ l � (SEE DEBATE) - J ' <br />PHASE 3 SITE ENTRANCE i� � I'' � � � / � � �+ 200' MINING OFFSET � PHASE 1 AND 2 SITE ENTRANCE <br />' � �' � � � � SCREENING 6 BUFF €RING BERMS � i FROM DITCH - p j J / � - / /� ' <br />ii _ i _ _� . " , �, - - - - _ (S € €- DETAIL) r a - �" - -- -. / . �_.G� � . � - -I � <br />- '- OHV OHU OHU NU O U U ' - _ — HRH - -� OHU— OHU OIL pHU� ONU— U ° / �. 1+( <br />OHU— 0 Ur— ° U— ONU— OHU� DIyZ -OHU �- 1 l I / _ <br />oHU-y- °HU— oHO— oHU— COU ROAD , - >, � .: H - �.- -r —o "u — Duv� --oHU— aHU -�. oHU— oHU— <br />1 OHU -� OHU— OHI�� OHU— OHU— °HU— OHU— OHU— OHU— OHV— OHU O U OHU— ONU— � _� ® � �_ �� � -' - OHU OHU �- °HU— <br />� ._� - i I — off — o "u— ° °HU— <br />°HU— o "u- <br />i ,'� i' REMOTE SCALE � i o "u— °HU— °HU— o "u -- <br />��� � ! / / ,�PJ,' CONVERTED OFFICE � <br />� / '.j�,�� (FORMER HOUSE) i>.� <br />PARKING �3 <br />O/� � - -- <br />�� � / ili <br />/ I 1 �. ioi ;_ J� <br />i i <br />� i <br />i <br />Hai - <br />�,Py, - � 6 s� ,- , <br />i ' <br />„� .�, '� <br />i -- �/ - •' <br />�' i i <br />I � � / � i <br />i <br />/ ' � <br />o � I <br />� , '' <br />1 -� �� ' <br />11 I + 1 "I'TII" iln I 1 ' II "P 'I('I it +'I'il °nlillPll <br />PUBLIC R,O.W./ <br />EXISTING <br />RESIDENCE <br />SEE PLANTING DETAIL <br />(ON RECLAMATION PLAN) <br />a � <br />b C7 <br />� Q < <br />GRASS <br />Z� <br />10' TYP. <br />40' - <br />BERM NK)lE: POSITION OF BERMS MAYBE <br />1EMPORARILY AD7USTED TO ALLOW FOR <br />INSTALLATION OF NATURAL GAS INFRASTRUCTURE. <br />GRASS <br />TYPICAL CROSS - SECTION OF SCREENING BERMS <br />NTS <br />TO BE REMOVED <br />FOR FINAL GRADE <br />THE OPERATOR MAY MINE TO \ <br />LIMIT OF EXCAVATION AT OR <br />NEAR VERTICAL SLOPES <br />(SEE NOTE B) <br />ANTLCIPATED GROUNDWATER LEVEL <br />MINING <br />ACTIVITIES <br />Permit #:11/� ,2c -C� , l'�f� <br />Class: �� rCf � T- Confidental ?: /y <br />Froml �.� 5 MV# <br />`e � To: � <br />Doc. Name: / 1C <br />TOP OF Doc. Date (if no date stamps - - - C 'Section /Exh.c <br />TOP OF MINING RECLAMATION Inspection Date — Specialist: ('M L ;.y <br />CUT rur <br />MINED SLOPE �� <br />(2.5H:IV) I <br />FINAL SLOPE <br />(3H:1V FOR 15' THEN 2H:1V) <br />(SEE EXHIBIT F DETAIL) I <br />— _ - ,�1I _ -- - -- - -- - - - - -- — ' -- - -- <br />-- - - - - - -__ _ SHALE /BEDROCK <br />TYPICAL EXCAVATION SLOPE DETAIL <br />NTS <br />I:15LOPES, EXCAVATE <br />IN PLACE (TYP.) <br />TRENCH NOTE: DEWATERING <br />TRENCHES ARE TEMPORARY <br />FEATURES, TO BE REMOVED PRIOR <br />TO FINAL RECLAMATLON. <br />DERMIT <br />BOUNDARY <br />25' MIN. <br />NATURAL <br />GROUND <br />RRr�►�,FD <br />SFp �' 7 2006 <br />Div,. ,q .ri;,�('I- +m?f,vn, <br />NLn, ,r <br />„iU J.. cly <br />PREPARED UNDER THE SUPERVISION OF: <br />�� � � ����� , ��` 1� <br />LINE WITH PLASTIC SHEETING <br />AS NEEDED TO STABILIZE SOIL �� � ' ' "mss` -� L�r`�- s -�E'- �'�I�.y�� '�- <br />DEWATERING TRENCH DETAIL �� <br />NTS <br />REVISED EXHIBIT C -2: MINING PLAN MAP <br />200 -FOOT SETBACK SCENARIO <br />�� BANKS AND GESSO, LLC SILT SAND � GRAVEL L.L.C. GRAND RIVER PARK PROJECT <br />� � 720 KIPLING ST., SUITE 117 DM6 112 PERMIT APPLICATION <br />LAKEWOOD, COLORADO 80215 0304 HIGHWAY 133 GARFIELD COUNTY <br />(303) 274 -4277 CARBONDALE, CO 81623 COLORADO <br />(970)963 -2296 <br />706 NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEE' <br />05021 9/5/06 1" =200' DRF <br />1 <br />