ccvovv
<br />GRAPHIC SCALE
<br />zoo o loo zoo aoo
<br />( IN FEET )
<br />1 inch = 200 ft.
<br />CONTROUR INTERVAL = 5'
<br />�, / .
<br />„ � INITIAL RECOVERY TO CONSTRUCT
<br />' CLARIFICATION BASIN
<br />\ � SUMP /CLARIFICATION BASIN
<br />"� (SEE NOTE 5)
<br />�, � COFFERDAM OR OTHER TEMPORARY
<br />��� � � IMPERMEABLEBARRIER
<br />MINING SCHEDULE
<br />SECTION LINE
<br />ACREAGE
<br />1.72
<br />PROPERTY LINE
<br />-- - -- -
<br />_ EASEMENT /ROW
<br />C
<br />� PROPOSED EASEMENT
<br />2.50
<br />PAVED ROAD
<br />16.86
<br />------- - - - - ----------------
<br />-----------------------------
<br />UNPAVED ROAD
<br />- - - - -
<br />- - DITCH /WATERWAY
<br />' ' ` "
<br />' ` ^ FLOODPLAIN ZONE A
<br />— " ' ' '
<br />FLOODPLAIN ZONE X
<br />- , — . , .., -- .-
<br />.. — „ - FLOODWAY
<br />�� �
<br />� �� MIMNG LIMIT /POND BOUNDARY
<br />'�
<br />� � � PERMIT BOUNDARY
<br />EXISTIN6INDEX CONTOUR
<br />EXISTING INTERMEDIATE CONTOUR
<br />— ` "� — ` "s ` "s —
<br />" "' — �s — EXISTING GAS LINE
<br />PROPOSED 6A5 UNE
<br />— °�*'— °HU— °HU—
<br />oHU— oHU EXISTING OVERHEAD UTILITY
<br />-
<br />- RELOCATED OVERHEAD UTILITY
<br />EXISTING PHONE CABLE
<br />r �
<br />-�-:
<br />EXISTING STRUCTURE
<br />� .T� `� - j • `�,
<br />• ��.�' J JURISDICTIONAL WETLANDS
<br />MW
<br />MONITORING WELL
<br />1
<br />DIRECTION OF MINING
<br />GRAPHIC SCALE
<br />zoo o loo zoo aoo
<br />( IN FEET )
<br />1 inch = 200 ft.
<br />CONTROUR INTERVAL = 5'
<br />�, / .
<br />„ � INITIAL RECOVERY TO CONSTRUCT
<br />' CLARIFICATION BASIN
<br />\ � SUMP /CLARIFICATION BASIN
<br />"� (SEE NOTE 5)
<br />�, � COFFERDAM OR OTHER TEMPORARY
<br />��� � � IMPERMEABLEBARRIER
<br />MINING SCHEDULE
<br />PHASE
<br />IA
<br />ACREAGE
<br />1.72
<br />RESERVE (TONS)
<br />76,500
<br />YEARS TO MINE*
<br />0.10
<br />16
<br />22.42
<br />1,300,300
<br />2.50
<br />2
<br />16.86
<br />829,200
<br />1.75
<br />3A
<br />38.19
<br />1,959,600
<br />4,00
<br />3B
<br />. ,..-� .
<br />24.34
<br />1,262,000
<br />2.75
<br />JCC IVV I C 7
<br />�" � NOTES:
<br />��,
<br />°' 1. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS SILT COLORADO QUADRANGLE AT 20' CONTOUR INTERVALS IMPhEMENTATION OF CONCURRENT RECLAMATION I5 REQUIRED TO LIMIT NEAR - VERTICAL SLOPES.
<br />-I - AND INTERPOLATED AT 5' CONTOUR INTERVALS.
<br />9. MINING SCHEDULE ASSUMES MAXIMUM RECOVERY OF DEPOSIT AND 500,000 TONS /YEAR MARKET DEMAND.
<br />/ yP �- �\ �.,, _ _ I 2. APPROXIMATE DEPTH OF MINED AREA IS 25 FEET WITH 2.5H:1V SIDE SLOPES. THE OPERATOR WILL MINE TO ACTUAL MARKET CONDITIONS AND MINING SCHEDULE MAY VARY.
<br />2.5:1 SLOPES, OR RECOVERY TO NEAR - VERTICAL SLOPES, WHERE PRACTICAL, GIVEN LIMITED OVERBURDEN ND
<br />�� d, � _ � _ � . _ _ _ _ . _ - _ LIMITED STOCKPILING FOOTPRINT. OVERBURDEN AND TOPSOIL, MATERIAL USED FOR SCREENING BERMS 10. ASPHALT AND / OR CONCRETE PLANT FACILITIES MAY BE LOCATED IN THE PHASE 1 / 3 PROCESSING AREAS.
<br />° , ,,� �
<br />' / �"`�' � I DURINfi MINTING WILL BE BACKFILL PLACED ALONG SHORELINE CROSS- SLOPES DURING FINAL RECLAMATION THE PROCESSING AREA MAY ALSO CONTAIN TRUCK PARKING, EQUIPMENT STORAGE, AND OTHER ACCESSORY
<br />/ ! / � �T - � ` > � TO ACHIEVE FINAL SLOPES OF 3:1 AND 2:1, AS IDENTIFIED IN THE RECLAMATION PLAN. USES. THIS AREA WILL BE PREPARED BY REMOVING ALL TOPSOIL AND OTHER MATERIALS SUITABLE FOR
<br />` � COLORADO FIVER RECLAMATION, REPLACING THE WORKING SURFACE WITH FILL AS NEEDED.
<br />�, ' a i 3. PHASE lA MINING TO GENERATE INITIAL SCREENING AND PROVIDE LANDSCAPE /WATER FEATURE AS BUFFER
<br />/ �` � � TO EAST. PHASE IA MAY BE LIMITED IN DEPTH OR EXTENT TO SPECIFICALLY MEET THESE FUNCTIONAL Il. FLOODPLAIN AND Fl00DWAY INFORMATION TAKEN fEMA MAP NUMBER 08020510910, REVISED AUGU
<br />�, � �- NEEDS. 2,2006. ST
<br />a4 - 1 ' �__ � _ ..�
<br />� I 4. RESERVE QUALITY. THE PROPERTY CONTAINS RELATIVELY HOMOGENOUS SAND AND NATURAL GRAVEL 12. PRIOR TO ERECTION OF PROCESSING AND PLANT FACILITIES, THE OPERATOR WILL REMOVE TOPSOIL AND
<br />/ �. °� \��/ .- - � - z J /i � } � I DEPOSIT ABOVE 25 FEET BELOW GRADE, WITH INTERMINGLED LARGER ROCK.
<br />° , �( . _ . � ;�'C `� � � '� � � - .. _ _ ` , `� _ . . � OVERBURDEN FROM THE PROCESSING AREA AND ENSURE (BY IMPORTIIJG OR GENERATING ON -SITE) A SOLID
<br />� J � ' 5. DEWATERIN6 ANO RECHARGE. THE SITE WILL BE DRY -MINED OR OTHERWISE DEWATERED TO PROVIDE AVAILALBLE, TOOA DEPTH OF AT LEASTE IXI NCHESOSALVAGED MATERIALS SHALLBBE STOR RED, WHERE
<br />� � �
<br />/ / {' ` .� � ` � - � ` � � � ® MACHINE ACCESS TO THE AGGREGATE RESOURCE PUMPED WATER WILL BE DIRECTED TO A SUMP AREA AFTER ED IN SCREENING
<br />� \ � 25' EM�BANKME)�f AT TOP ( AND BUFFERING BERMS (FOR LOCATION, SEE PLAN) AND PHASE I OVERBURDEN STAGING (SEE PLAN AND NOTE
<br />� ,, � `'� ; , .1� � o �� '� - , (3:1 MIN. SIDE SLOPES � I, INITIAL RESOURCE RECOVERY IN SUMP FOOTPRINT AND CONSIRUCIION OF COFFERDAM) FOR CLARIFICATION BELOW).
<br />' � �� � - `�' ` AND USE IN WETLAND RECHARGE OR DISCHARGE TO COLORADO RIVER IN ACCORDANCE WITH PERMITS FROM
<br />r � � ''' ° 1 ; ' - - - -'� \\\ � \ - . (SEE OTE 14) \ ENVIRONME�ES (E.G. ARMY CORPS OF ENGINEER'S, COLORADO DEPARTMENT OF PUBLIC HEALTH AND 13. PHASE l OVERBURDEN STAGING. NON- TOPSOIL OVERBURDEN TO TH
<br />i � � - - - = �\ � � �\ - - - � � PROCESSING AND MINING AREAS, WILL BE STOR E EXTENT PRESENT 7N PHASE 1
<br />NG OFFSET 1 � ° , , � - . _ . _ - -
<br />ED IN A TEMPORARY STOCKPILE, AS DEPICTED ON THIS PLAN.
<br />\ 6. INTERNAL HAULING. THE OPERATOR WILL COOPERATIVELY USE DEVELOPED GAS ROADS AS INTERNAL ACCESS MININ605IDEISLOPES OR CONCUORRENT RECLAMA�II�ALS TO BE PLACED WITHIN CLARIFICATION BASIN OR
<br />OM ROAD (TYP.) / / � \ �1 � - ,\ \\ � I f i _ _ _ _ _ _ _ _ � \ AND HAUL ROUTES, AS APPROPRIATE. ON. THE STOCKPILE WILL BE REMOVED PRIOR TO PHASE i
<br />- -. . -. -. 1 ` I -_
<br />` \ MINING ]N THIS AREA.
<br />° , ' � \ - I - - - I � . I i \ j(,'' 2� � 7. TOTAL SURFACE AREA SUBJECT TO MINE
<br />, i i s
<br />D LAND RECLAMATION PERMITTING, AS ILLUSTRATED, IS 163.31 14. SPILLWAYS. RIPRAD- ARMORED SPILLWAYS WILL BE INSTALLED TO ALLOW FOR FII.I -ING OF PIT AREAS PRIOR
<br />°' / ° 2 � ' I PHASE 1 B \ �' - +� -- v ___ ACRES. TO FLOOD CRESTING AND METERED OU11ET1IN6 OF FLOODWATERS FROM ACTIVE OR RECLAIMED PITS
<br />,.. . \-- ; ; ;:.: ;- I� - - -' - ' MINING AREA '\ - - ",
<br />8. CONCURRENT RECLAMATION BASED ON LIMITED OVERBURDEN COVERAGE ON DEPOSIT, THE OPERATOR MAY FOLLOWING THE 100 -YEAR FLOOD. CULVERTS, SIPHONS, AND OTHER STRUCTURES MAY BE USED TO CRO55
<br />' � � HYDROCARBON i - }+ DITCH LATERALS.
<br />° / , ' � - - RECOVERY PAD i (22.42 ACRES) `'• MINE TO FINAL RECLAMATION SLOPES. GIVEN AVAILABLE OVERBURDEN FOR CONCURRENT RECLAMATION, THE
<br />- � � � \ � OPERATOR MAY ALSO MINE TO NEARLY VERTICAL AND BACKFILL TO FINAL RECLAMATION SLOPE. NO MORE 15. GROUNDWATER MONITORING WELLS SHALL REMAIN INTACT FOR THE DURATION OF MINING.
<br />1O � -' / � I � I = - : - ; - ; . = + ; • ; - a. \ \ � .` THAN 1,000 LINEAR FEET OF WORKING FACE WILL EXCEED A STABLE POST - MINING CONFIGURATION BEFORE
<br />.° - \ � �.
<br />, \
<br />I � � I
<br />P � �
<br />� � -� � 1� I � '." - _ � i �
<br />�h'C ; • ' � ` _ , • - : - ; - ; - ; ; - : `�a ��� ��\ ` + -` I DEWATERING TRENCH
<br />�� / ® ` PHASE 3A - - � '� (sEE Deran>
<br />Z / ` -� MINING AREA - - - - - � � \ I I
<br />+
<br />I / �� � (38.19 ACRES) `:, - _. - - - y, I \ , . -. I
<br />/ ` - � �
<br />F s �'� �
<br />"� PHASE 1 / 2 PROCESSING AREA ' � "- ``
<br />� (SEE NOTE 12, APPROX. LIMIT) _ � �� - . i \�� ++
<br />x"11 ;o � / � a
<br />° r o � ~/� " .' ` CONCRETE PLANT - i - - � � -� #'� ' � SPILLWAY I
<br />/ - , � / � - - (IYP.) " . ' . �, � ��. (SEE NOTE 14) �:
<br />'° � � E � ii / \ � �` ASPHALT PLANT - � '' PHASE I OVERBURDEN STAGING
<br />/ � 1 Y � (TYP.) - :� - �- (SEE NOTE 13)
<br />PRODUCT SORTING !- � I I /
<br />25' FROM TOP OF BANK (n'P.)
<br />PHASE 3 ASPHALT / � � - -- �y
<br />' CONCRETE PLANT AND' `° ` � _ / PROCESS /WASH WATER POND � i L ��
<br />- - - - -- _� , h _�
<br />� PROCESSING AREA � _ �� —s•s -- 9 —��� . � i�
<br />� �� I � ..,. � �_ _ tv� sr5 9jby � s � .
<br />` �r
<br />/ � 1� .,, (SEE NOTE 12, � � � �- - - -- —� —. - --�— °.u�H —;�. —_ � �d. _ .; (4
<br />' i �' � � APPROX. LIMIT') 25' FROM TOP OF BANK ��� � � � i ti � � 25' �� `
<br />/ i' � " � / � �I /_ _ _ _ __ _ / _ACCESS ROAD AND PROPOSED PIPE OR REALIGN LAST CHANCE
<br />I � \
<br />E � � � i PIPELINE EASEMENT DITCH NORTHERN LATERAL
<br />� � I'° - / / `- PHASE 3 PROCESSING AkE� \ ✓ �
<br />i �F� - � (APPROX. LIMIT) / ' � i FROM POINT OF DIVERSION
<br />r 'I - . - } - - - - ' . �, }� EXI NG DRIVE AY TO BE `. � / .. � � � � NYD�iOC� N �
<br />11 / �� M NTAINEO TE RARILY, \� _ � jREDOVERYPAD i �'
<br />l� � � I - '- - ' - - : - ,! � _ ` NO TRUCK HAUL /USE POR MINING / r i
<br />r
<br />�I _ a
<br />Lj ;jl� '°�,� , -�'� `+ � - \ i i � �� / /./ � °'25'FOR MTOPOFBANK i �� PHASE SA
<br />� f l,' , �. I � PHASE 36 / � ' MINING AREA
<br />aELOCa � I` . ' �� e � � +` HYDROCaReoN ++ MINING AREA : ^' ; I � i i
<br />TED UTILITY i '�_ - -�� ` i� � + ++ RECOVERY PAD ++ `- � (24:34 ACRES) i � � / / % � (SEE NOTE 3
<br />� ,�1 °E ++ �+� � �- _ � i - �
<br />N � Ij�� ,+ i •S � / � • / PHASE 2 I � TEMPORARY SCREENING BERA�S- -
<br />-1 N I I , 'y + `,, � � 50' STOCKPILE OFFSETi(TYP.) , °Z ' (SEE DETAIL � - -
<br />1 ++ ' ' � ^' MINING AREA , �� )
<br />� ' � 1 �, (UNLESS MINED TOSTABLE � � I / (16.86 ACRES) �
<br />I it � 1 ' / SUPPORTING SLOE PER DMG) ° ' � i
<br />YI ' __ ' � , � �' 200' MINING OFFSET FROM KANCILIA I � '^ - ��
<br />li � I I- � / -- ^,� RESIDENCE AND OUTBUILDINGS � �
<br />" 1 �,�' �4 v „ i d -_ / _ TEMPORARY SCREENING BERMS ' �' MIN. / ``
<br />-' ° `� �' 25' FROM TOP OF BANK i � r _ _ l � (SEE DEBATE) - J '
<br />PHASE 3 SITE ENTRANCE i� � I'' � � � / � � �+ 200' MINING OFFSET � PHASE 1 AND 2 SITE ENTRANCE
<br />' � �' � � � � SCREENING 6 BUFF €RING BERMS � i FROM DITCH - p j J / � - / /� '
<br />ii _ i _ _� . " , �, - - - - _ (S € €- DETAIL) r a - �" - -- -. / . �_.G� � . � - -I �
<br />- '- OHV OHU OHU NU O U U ' - _ — HRH - -� OHU— OHU OIL pHU� ONU— U ° / �. 1+(
<br />OHU— 0 Ur— ° U— ONU— OHU� DIyZ -OHU �- 1 l I / _
<br />oHU-y- °HU— oHO— oHU— COU ROAD , - >, � .: H - �.- -r —o "u — Duv� --oHU— aHU -�. oHU— oHU—
<br />1 OHU -� OHU— OHI�� OHU— OHU— °HU— OHU— OHU— OHU— OHV— OHU O U OHU— ONU— � _� ® � �_ �� � -' - OHU OHU �- °HU—
<br />� ._� - i I — off — o "u— ° °HU—
<br />°HU— o "u-
<br />i ,'� i' REMOTE SCALE � i o "u— °HU— °HU— o "u --
<br />��� � ! / / ,�PJ,' CONVERTED OFFICE �
<br />� / '.j�,�� (FORMER HOUSE) i>.�
<br />PARKING �3
<br />O/� � - --
<br />�� � / ili
<br />/ I 1 �. ioi ;_ J�
<br />i i
<br />� i
<br />i
<br />Hai -
<br />�,Py, - � 6 s� ,- ,
<br />i '
<br />„� .�, '�
<br />i -- �/ - •'
<br />�' i i
<br />I � � / � i
<br />i
<br />/ ' �
<br />o � I
<br />� , ''
<br />1 -� �� '
<br />11 I + 1 "I'TII" iln I 1 ' II "P 'I('I it +'I'il °nlillPll
<br />PUBLIC R,O.W./
<br />EXISTING
<br />RESIDENCE
<br />SEE PLANTING DETAIL
<br />(ON RECLAMATION PLAN)
<br />a �
<br />b C7
<br />� Q <
<br />GRASS
<br />Z�
<br />10' TYP.
<br />40' -
<br />BERM NK)lE: POSITION OF BERMS MAYBE
<br />1EMPORARILY AD7USTED TO ALLOW FOR
<br />INSTALLATION OF NATURAL GAS INFRASTRUCTURE.
<br />GRASS
<br />TYPICAL CROSS - SECTION OF SCREENING BERMS
<br />NTS
<br />TO BE REMOVED
<br />FOR FINAL GRADE
<br />THE OPERATOR MAY MINE TO \
<br />LIMIT OF EXCAVATION AT OR
<br />NEAR VERTICAL SLOPES
<br />(SEE NOTE B)
<br />ANTLCIPATED GROUNDWATER LEVEL
<br />MINING
<br />ACTIVITIES
<br />Permit #:11/� ,2c -C� , l'�f�
<br />Class: �� rCf � T- Confidental ?: /y
<br />Froml �.� 5 MV#
<br />`e � To: �
<br />Doc. Name: / 1C
<br />TOP OF Doc. Date (if no date stamps - - - C 'Section /Exh.c
<br />TOP OF MINING RECLAMATION Inspection Date — Specialist: ('M L ;.y
<br />CUT rur
<br />MINED SLOPE ��
<br />(2.5H:IV) I
<br />FINAL SLOPE
<br />(3H:1V FOR 15' THEN 2H:1V)
<br />(SEE EXHIBIT F DETAIL) I
<br />— _ - ,�1I _ -- - -- - -- - - - - -- — ' -- - --
<br />-- - - - - - -__ _ SHALE /BEDROCK
<br />TYPICAL EXCAVATION SLOPE DETAIL
<br />NTS
<br />I:15LOPES, EXCAVATE
<br />IN PLACE (TYP.)
<br />TRENCH NOTE: DEWATERING
<br />TRENCHES ARE TEMPORARY
<br />FEATURES, TO BE REMOVED PRIOR
<br />TO FINAL RECLAMATLON.
<br />DERMIT
<br />BOUNDARY
<br />25' MIN.
<br />NATURAL
<br />GROUND
<br />RRr�►�,FD
<br />SFp �' 7 2006
<br />Div,. ,q .ri;,�('I- +m?f,vn,
<br />NLn, ,r
<br />„iU J.. cly
<br />PREPARED UNDER THE SUPERVISION OF:
<br />�� � � ����� , ��` 1�
<br />LINE WITH PLASTIC SHEETING
<br />AS NEEDED TO STABILIZE SOIL �� � ' ' "mss` -� L�r`�- s -�E'- �'�I�.y�� '�-
<br />DEWATERING TRENCH DETAIL ��
<br />NTS
<br />REVISED EXHIBIT C -2: MINING PLAN MAP
<br />200 -FOOT SETBACK SCENARIO
<br />�� BANKS AND GESSO, LLC SILT SAND � GRAVEL L.L.C. GRAND RIVER PARK PROJECT
<br />� � 720 KIPLING ST., SUITE 117 DM6 112 PERMIT APPLICATION
<br />LAKEWOOD, COLORADO 80215 0304 HIGHWAY 133 GARFIELD COUNTY
<br />(303) 274 -4277 CARBONDALE, CO 81623 COLORADO
<br />(970)963 -2296
<br />706 NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEE'
<br />05021 9/5/06 1" =200' DRF
<br />1
<br />
|