My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-10-29_PERMIT FILE - M1982200
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1982200
>
1982-10-29_PERMIT FILE - M1982200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:48:50 PM
Creation date
11/24/2007 9:44:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982200
IBM Index Class Name
Permit File
Doc Date
10/29/1982
Doc Name
ADEQUACY RESPONSE
From
WILLIAMS R BEAVERS
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIII III • <br /> 999 <br /> 28 October 1982 <br /> , <br /> Mark Loye De RECE�a``??!! E D <br /> Department of Natural Resources �U..JJ <br /> Mined Land Reclamation Division <br /> 1313 Sherman Street OCT 2 9 1982 <br /> 423 Centennial Building <br /> Denver , Colorado 80203 MINED LAND RECLAMATION <br /> Dear Mark : Colo. Dept. of Natural Resource <br /> The following points will be incorporated in the Red <br /> Jasper Granite operation as per our conversation of <br /> October 25 , 1982 . <br /> (1 ) The proposed 50 ' High hall to be left on the Southern <br /> side of the quarry (Southern portion of the Red Area <br /> Map 2) will be segmented at the 2S ' level with a bench . <br /> Bench width will equal blade width , but will not be <br /> less than 10 feet . The bench should slope 1 -2% for <br /> drainage and be inclined 1 - 2 feet toward cut slopes . <br /> The top portion of the high wall will be pulled back <br /> to a 1 . 2S to 1 slope . (Figure 1) <br /> (2) The pad (working surface) will be constructed so <br /> that it dips 1 - 2% to the northwest in order to drain <br /> into the tallus area below the pad . <br /> (3) It is anticipated that the shortage of topsoil will <br /> limit the full coverage of the mined area at the <br /> prescribed depth of 8 -10" of topsoil . Therefore , it <br /> is proposed that the topsoil will be replaced on the <br /> mined area at a depth of 8 -10" in areas where pockets <br /> of topsoil will be stable and have less chance of <br /> eroding (i . e . , near the High hall and away from the <br /> Callus drainage areas) . This selective placement of <br /> topsoil will insure the best chance for vegetation <br /> establishment . <br /> Sincerely , <br /> William R. Beavers <br />
The URL can be used to link to this page
Your browser does not support the video tag.