Laserfiche WebLink
~ III IIIIIIIIIIIIIIII ~' <br />STAT~OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Depa«ment of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver. CO 80203 <br />303 8563567 <br />FA x' 303 832 8106 <br />December 17, 1990 <br />Mr. Rick Ullom <br />Quality Control <br />Elbert County <br />P.O. Box 597 <br />Kiowa, Colorado 80117 <br />pF<~'CO~i~ <br />~ ~ i~q~$ <br />tip. 1 <br />~~ " <br />• ~ /876 ~ <br />Roy Romer, <br />Governor <br />Fretl R. Banta. <br />Division Director <br />Re: Fondis Pit, Revision Approval, Permit Wo. M-88-101, Revision No. TR-O1 <br />Dear Mr. Ullom: <br />On December 11, 1990 the Colorado Mined Land Reclamation Division <br />conditionally approved the technical revision application submitted to the <br />Division on November 1, 1990, addressing the site stability concerns. The <br />terms of TR No. O1 approved by the Division are hereby incorporated into <br />Permit No. M-88-101. <br />The conditions of the Division approval are noted below. Please note that all <br />other provisions of Permit No. M-88-101 remain in full force and effect. <br />1. By May 31, 1991, rip rap sized to withstand the 25-year 24-hour <br />storm event mrst be placed adjacent to the stream such that the <br />base of the pit outslope is protected from erosion. The Army Corps <br />of Engineers mist be contacted prior to placement of this material <br />in order to determine the necessity of a dredge and fill permit. <br />2. A minimum 15 feet wide berm must be maintained at its present <br />elevation at the pit edge above the outslope. Equipment shall not <br />access the berm. Materials shall not be stockpiled on the berm. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~~- <br />Steven G. Renner <br />Senior Reclamation Specialist <br />SGR/eke <br />cc: James Taylor, Denver, Colorado <br />0505G <br />