Laserfiche WebLink
~ III IIIIIIIIIIIII III <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 2 t 5 <br />Denver. CO 80203 <br />303 8663567 <br />Fax: 303 632-Bt06 <br />June 11, 1590 <br />Mr. Marshall Butler <br />Fremont County <br />615 Macon Avenue, Room 8-5 <br />Canon City, CO 81212 <br />sTA <br />Re: M-90-047, Quagmire Creek, Permit Issuance <br />Dear Mr. Butler: <br />OF COLORADO <br />pF~p(p <br />,~4 i 4 <br />fie, .: { l/Fr vv <br />--' <br />=_ ` <br />/R'!b <br />Ray Ramer. <br />Go~emor <br />Frea R Bania. <br />Divison Dueaor <br />On June 08, 1990, the Mined Land Reclamation Division found Fremont County to <br />have satisfied the applicable requirements of C.R.S. 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permitis oeing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit. by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. Ors your permit anniversary date each year, June 08, you must submit an <br />annual report to us. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for <br />112 P6~rmits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />,.r- -- <br />i; <br />FRED F:. BANTA <br />Di rector <br />Enclosure <br />7706G <br />