Laserfiche WebLink
' RPR-12-199~~ 15 03 SRNDCO, INC. <br />~' <br />• Ill IIIIIIlIIIIIIIII • <br />sarioco Irvc <br />_~ <br />Telephorre PLANT: 970-247-1303 BOOI~EPING: 970.247-9331 <br />F2x PLANT:970382SY10 BOOKFEPING: 970.247AC~B <br />E91 GR 252 <br />PO BO:C 4440 <br />ouw~,NGO co 81302 <br />RECEIVECi <br />APR 1 6 1999 <br />wsicn of Minerals 8 Geobgy <br />~1'~ !ie-i ~T ~-7V <br />PU~'LIC ~t'~E ~;;~~-~Y <br />Ffi_E: M-87-o~y <br />SITE: ~ktlfa4 ~nq $la~l'~ePtf <br />DATE: April 12, 1999 <br />T0: CMLRB (Division of Minerals & Geology3 <br />FROM: Sandco, Inc. <br />P.01 <br />Received <br />APR 1 2 1°-y9 <br />Durango Fisld 0`fice <br />Division cf ~;Sn^,c~o;c ~ Gaolccy <br />RE: Sandco, Inc., would like to temporarily withdraw the <br />request for declaratory order dated April 28-29, 1999. <br />This based on conversation with Wally Erickson regarding <br />possibility of Technical Revision for Sandco's post- <br />mining land use on the processing area of 14 acres. <br />Sandco will proceed with bond on the in-stream reclamation <br />at this time. <br />Thank you, <br />~id ~i11.~1~ <br />David Dillon, President <br />Sandco, Inc. <br />