Laserfiche WebLink
<br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />(303)824-4451 <br />III IIIIIIIIIIIII III <br />999 <br />• <br />August 11, 1983 <br />Mr. Dan Mathews <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Dan: <br />Per our conversation on August 10, 1983 concerning overburden <br />sampling of the "A2" and "A3" truck/shovel lifts, Colowyo requests a minor <br />revision allowing sampling of these intervals to be suspended. The basis <br />for the request is that our operations plan requires the "A2" and "A3" <br />lifts to be spoiled low and later covered by greater than 100 feet of cover <br />from the interburden above "X" seam and overburden above the "Y" seams. <br />Due to haul distance and grades it is highly unlikely Colowyo <br />would change the operation plan and dump the intervals high. If in the <br />event Colowyo does change the operation plan and decides to dump "A2" and <br />"A3" intervals high, Colowyo will resume sampling of the intervals. <br />Thank you for your cooperation in this matter. If you have any <br />questions or need additional information, contact me at your earliest <br />convenience. <br />Sincerely, <br />COLOWYO COAL COMPANY <br />J~~/72-y" ~ Z/ <br />Ed Moyer <br />GeologistJReclamation Specialist <br />ETM/llh <br />cc: R.G. Atkinson <br />bbc: L.B. Gray <br />J.A. Kiger <br /> <br /> <br />_,... . <br />