My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55254
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:18 PM
Creation date
11/23/2007 10:10:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
6/20/1991
Doc Name
EMERGENCY COAL RAMP TO FIGHT COAL FIRES PN C-81-044
From
CYPRUS EMPIRE CORP
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiii-iiiiiii <br />999 <br /> <br />c~~us <br />Bmpire Corporation <br />P.O. Box 68 <br />Craig, Colorado 81626 <br />303-82•i-6246 <br />F'ECEIVE~ <br />June 17, 1991 <br />JUN 2 0 ~gq~ <br />Mined Land <br />Mr, earl Mount Reclamation Division <br />Mined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />RE: Emergency Coal Ramp to Fight Coal Fires <br />Permit C-81-044 <br />Dear Mr. Mount: <br />The following emergency and plan of action was discussed with and <br />approved by Jim Stevens (CMLRD) on 6/17/91. Due to an emergency <br />resulting from fires in Cyprus Empire Corp (CEC) coal stockpile it <br />was necessary to construct a ramp to access and fight the fires. <br />This ramp was constructed of coal and is on the south side of the <br />coal pile. The ramp blocks and covers ditch 5-D1 and culvert 38 <br />(see Map 26 of Permit). In order to provide some protection for <br />area, CEC will build a temporary containment berm around the coal <br />ramp and disturbance which is now outside sediment containment. <br />It is anticipated that the ramp will be needed for two or three <br />weeks. CEC will remove all coal, reclaim and resecad the area when <br />these fires are under control. <br />If there are questions, please contact me. <br />Sincerely, <br />Terrell K. ohnson <br />Environmental Engineer <br />vld <br />enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.