Laserfiche WebLink
999 <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7373 Sherman St.. Room 275 <br />Denver. C0802O3 <br />303 866-3567 <br />Fa x: 303 832-6706 <br />STA1~ OF COLORADO <br />pF COQ <br />~6 _ p4 <br />HP ~l 'O <br />7876 <br />Roy Ramer. <br />Governor <br />October 21, 1991 <br />Mr. Charles A. Steen <br />Gold Hill ~ Colino Oro Molino <br />P.0. Box 1523 <br />Longmont, CO 60502 <br />Fretl R. Banta, <br />Onrision Director <br />Re: Cash Mine, Succession Approval, Permit No. M-83-141, Revision No. SO-Ol <br />Dear Mr. Steen: <br />On October 16, 1991 the Colorado Mined Land Reclamation Board approved the <br />succession of operators from Gold Hill Mining Company to Gold Hill & Colino Oro <br />Molino for this operation. Gold Hill & Colino Oro Molino is now the permitted <br />operator of the Cash Mine, and as such, is responsible for all provisions in <br />Permit No. M-83-141, as well as those specified in the Minerals Rules and <br />Regulations. Gold Hill Mining Company is relieved of all responsibilities <br />concerning this operation (See Mineral Rules and Regulations Number 1.7). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.6 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual <br />fee and annual report to us. Please consult Rule 3.4 for 110 Mineral Permits, <br />Rule 2.4 for i12 Permits, and Statute Section 34-32-11o'(i)(a) for i11 Permits, <br />for the specific annual report requirements applicable to your mine. <br />If you have any questions, contact me. <br />Sincerely, <br />.-; <br />James C. Stevens <br />Senior Reclamation Specialist <br />JCS/ern 4513G <br />