My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55203
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:16 PM
Creation date
11/23/2007 10:07:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
5/29/1981
Doc Name
STIPULATIONS WESTERN FUELS-UTAH INC DESERADO MINE
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ~ ~ III IIIIIIIIIIIII III <br />STIPULATIONS <br />WESTERN FUELS - UTAH, INC. <br />DESERRDO MINE <br />1. PRIOR TO ISSUANCE OF A PERMIT TO CONDUCT MINING OPERATIONS, TXE APPLICANT <br />N,UST <br />(a) SUBMIT A PERFORMANCE BOND PAYABLE TO THE STATE AND THE U.S. GOVERNMENT IN <br />~AA' AMOUNT CONSISTENT WITH THE REQUIREMENTS OF (b) BELOW AND THE RECLAMATION <br />COST ESTIMATES CONTAINED IN THE APPLICATION. <br />(b) SUB192T A MAP SXO[4ING EACH AREA OF LAND ON TXE PROPOSED PERMIT AREA FOR <br />[JHZCH A PERFORMANCE BOND WILL BE SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES <br />TO OCCUR ON THOSE AREAS OF LAND, AND IDENTIFY TXE AMOUNT OF PERFORMANCE BOND <br />TO COVER RECLAMATION COSTS ASSOCIATED 6tITH EACH AREA OF LAND. <br />2. UPON COAfPLETION OF PRODUCTION MINING WITHIN THE EASTERN MOST PORTION OF <br />ROOM AND PILLAR PANEL R.P.I-D RND THE EASTERN HALF OF I,ONGWALL PANEL L.W.D.-1, <br />THE APPLICANT SHALL PREPARE ANALYSIS OF THE SUBSIDENCE MONITORING DATA <br />COLLECTED TO THAT DATE. NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS UNTIL THAT REPORT HAS BEEN REVIEWED AND APPROVED BY THE <br />` REGULATORY AUTHORITY. IF THE RESULTS OF THAT ANALYSIS DETERMINE THAT A REVISION <br />OF THE MINING PLAN FOR THE REMAINDER OF THE MINE IS APPROPRIATE, THE APPLICANT <br />SHALL COMPLETE THE APPROPRIATE REVISIONS AND SUBAfIT THEM TD THE REGULATORY <br />AUTHORITY FOR REVI~ti'. ~NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS OF T.YE MINE UNTIL THAT REVISION NAS BEEN APPROVED BY THE <br />REGULATORY AUTHORITY. <br />3. NO SUBAREA OF THE REFUSE DISPOSAL AREA SHALL BE DISTURBED BY MINING <br />/ ACTIVITIES UNTIL THE APPLICANT HAS DEMONSTRATED TO THE REGULATORY AUTHORITIES' <br />SATISFACTION THAT S;TFFZCIENT NON-TOXIC MATERIAL ZS AVAILABLE TO COMPLY WITH <br />RULE 4.10. <br />4. A PLAN MUST BE SUBMITTED TO THE REGULATORY AUTHORITY WITHIN 30 DAYS OF <br />~ APPROVAL OF THIS MINE PLAN FOR THE HANDLING kND DISPOSAL OF MATERIAL ZN THE <br />"STORAGE AREA" RND A POST-MINING TOPOGRAPHIC MAP OF THE RAILROAD STORAGE AND <br />LOAD OUT AREAS. <br />5. TXE APPLICANT WILL INCORPORATE OVERBURDEN ANALYSIS SUBMITTED TO THE <br />REGULATORY AUTHORITY Ot7 MAY 29, 1981, INTO THE MINE PLAN WITHIN 30 DAYS OF <br />APPROVAi OF THE PERMIT. <br />6. THE APPLICANT MUST SUBMIT A MONITORING PLAN FOR THE WHITE RIVER ALLUVIUM <br />TO ENSUP.E THAT DRAWDOWN PROJECTIONS ARE NO LARGER THAN ANTICIPATED, AND THAT <br />~ THE MONITORING OBJECTIVES OF SECTION 9.24.5 OF THE COLORADO PERMANENT REGULATORY <br />PROGRAM ARE MET. THIS INFORMATION MUST BE SUBPfZTTED TO THE REGULATORY AUTHORITY <br />WITHIN 90 DAYS OF THE GRANTING OF THE PERk1IT. <br />7. THE APPLICANT MUST ALSO COMMIT TO PROVIDING A N.ITIGATION PLAN SHOULD THE <br />.~ EFFECTS OF DRAWDOWN IN THE WHITE RIVER ALLWIAL AQUIFER DETRIMENTALLY EFFECT <br />~ ESTABLISHED AGRICULTURAL ACTIVITIES, EITHER THROUGH UNFORESEEN IMPACTS OR FROM <br />GROUNDWATER DEPLETIONS YJHICH ARE LARGER THAN EXPECTED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.