My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51254
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:39 PM
Creation date
11/23/2007 6:39:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
6/22/1995
Doc Name
RESPONSE TO TELEPHONE CALL ON 6/12/95 & LETTER DATED 5/18/95 CONCERNING GOLDEN EAGLE MINE BASIN RESO
From
DMG
To
ANN TATUM
Permit Index Doc Type
CITIZEN COMPLAINTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i_ <br />999 <br />~ RPP <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1111 Shaman St., Room 21 5 <br />Denver, Colorado 80201 <br />Phone 0011 86h-}567 <br />FAX: 11031 872 8106 <br />June 22, 1995 <br />Ms. Ann Tatum <br />8703 Bonhomme <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />Eveculive Director <br />Michael B. Long <br />Division Dueaor <br />Houston, Texas 77074 <br />RE: Response to telephone call of June 12, 1995 and letter dated <br />May 18, 1995 concerning Golden Eagle Mine, Basin Resources, <br />Inc., Permit #C-81-013 <br />Dear Ms. Tatum: <br />On June 12, 1995 you telephoned Susan McCannon to further inquire <br />about the noise reduction structures referenced in section 4.04 of <br />TR-15. This is the Technical Revision which addressed the NW-1 <br />exhaust shaft. <br />Several months ago when you telephoned me I do not remember <br />discussing TR-15 with you. Rather, I recall that I directed you to <br />Joe Dudash, as he was the Reclamation Specialist assigned the <br />Golden Eagle mine at that time. <br />I was the Reclamation Specialist who reviewed and approved TR-15 on <br />November 28, 1990. The language regarding noise reduction <br />structures is a part of TR-15. This language was not required by <br />me, however, since the Division has no statutory or regulatory <br />basis for such a requirement, I was aware that the exhaust shaft <br />installation may generate noise and that there may be noise impacts <br />to workers nearby. I therefore requested that the permittee <br />include a provision for noise reduction structures. They agreed to <br />this request and included the language. Inclusion of the language <br />on the part of the permittee was discretionary, however, not <br />compulsory. <br />On August 9, 1990 I approved TR-14 which addressed the intake shaft <br />installation. As you are aware, TR-14 does not include any <br />language regarding noise reduction structures. You asked why I did <br />not request noise reduction structures language in this earlier TR. <br />I was not aware that noise levels associated with the intake shaft <br />installation could potentially pose a problem, Moreover, as stated <br />above, because the Division has no jurisdiction over noise levels, <br />noise levels were not, and are not, under my purview. <br />
The URL can be used to link to this page
Your browser does not support the video tag.