My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-04-26_GENERAL DOCUMENTS - M1978352
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1978352
>
1983-04-26_GENERAL DOCUMENTS - M1978352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 2:34:14 PM
Creation date
11/23/2007 6:13:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978352
IBM Index Class Name
General Documents
Doc Date
4/26/1983
Doc Name
EAGLE PIT PN 78-352
From
MLR
To
NOTINGHAM S&G
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STATEOFCOLORADO RICHARDD LAMM Gove, III IIIIIIIIIIIII'll <br /> DEPARTMENT OF NATURAL RESOURCES 999 <br /> D.Monte Pascoe,Executive Director <br /> MINED LAND RECLAMATION <br /> • 423 Centennial Building, 1313 Sherman Street <br /> Denver,Colorado 80203 Tel.(303)866.3567 <br /> .. <br /> David C. Shelton <br /> Director <br /> April 1, 1983 �GJ h �p4��jp <br /> Notingham Sand & Gravel <br /> C 4,: . <br /> P.O. Box B <br /> Avon, Colorado 81620 1983 <br /> Re: File No. 78-352; EAGLE PIT V <br /> Based upon our records, the anniversary date of your mining operation permit is <br /> _ April and annual fees for the year(s) 79R? , totalling <br /> $ 350.00 are due on that date. Fees are based upon a .schedule of <br /> $350.00 if the operation is an open mining operation of 10 acres or more and <br /> $275.00 for any other operation 10 acres or more. <br /> Also, to bring the Division up to date as to the mining and reclamation on the <br /> • site, please submit a report and map (to a scale of not less than 100' to the <br /> inch and not more than 660' to the inch) , indicating the phases of the reclama- <br /> tion plan which have been completed, correlated with the timetable. The report <br /> and map shall contain the following information: <br /> 1) Location and number of acres affected during that year, <br /> 2) Locations and number of acres reclaimed for that year, <br /> 3) The location and number of acres in the various stages of reclamation <br /> (backfilled, graded, topsoil replaced, revegetated) , <br /> 4) The species of vegetation planted, the locations and approximate dates <br /> of planting, <br /> 5) The type and approximate quantity of fertilizers, organic material or <br /> soil conditioners used and location of use, <br /> 6) An appraisal of the success of reclamation efforts, and in the event <br /> of failure of any efforts, a short narrative on the suspected or determined <br /> causes of such failure, <br /> 7) Estimates of the location and number of acres to be affected in the <br /> coming year, and <br /> 8) The effective date of the information provided above shall be no more <br /> than 45 days prior to the anniversary date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.