Laserfiche WebLink
07/14/99 WED 19:52 FA}; 303 452 4515 ADCO/CHEROAEE/BAYER < <br />~~ ~ ~ III IIIIIIIIIIIIIIII ~ ~oDl <br />999 <br />ADCO Consulting <br />2090 E, 104th Avenue, #305 <br />Thornton, Colorado 80233 <br />450-2204 <br />Fax: 452-4515 <br />FAX TRANSMISSION COVER SHEET <br />Date: July 14, 1999 <br />To: DMG, da Tom Schreiner and Alan Sorenson; <br />cc: CAMAS, do Mike Refer <br />Fax: 303-832-8106 (DMG); a: 303-716-5299 (CAMAS) <br />Rc: Revised PSCo Liarnse, Permit #M-99-034 <br />Sender: Robert N. Fleming <br />YOU SHOULD RECEIVE 3 PAGE(S), INCLUDING THIS COVER SHEET. IF <br />YO U DO NOT RECEIVE ALL THE PAGES, PLEASE CALL 450-2204. <br />Attached are the revisions to two sections of the PSCo. license. These revisions were <br />initiated at Tom Sorenson's request in his memo of 06/21/99. The revisions are: <br />1. Adding to item #17 a sentence which states that the Slurry Wall is permanent <br />across the PSCo. easement and is not required to be removed. <br />2. Added a section (f) to item #23. (f) references the map exhibits, which in <br />addition to the slurry wall location and mining within 200' of the PSCo. towers, <br />also depicts the 35' setbacks from the PSCo. right of way and thus grants <br />permission to CAMAS to mine within 35' of the PSCo. right-of-way. <br />The language used in each case is almost exactly what Alan Sorenson suggested, but <br />before I get the license agreement signed by CAMAS and sent back to PSCo., T want to <br />make sure these revisions are acceptable to the DMG. <br />