NOV 6'97 15:16 FR BARR ENGINEERING <br />612 B32 2601 TO 9295595--0626016 P.02i10 <br />III IIIIIIIIIIIIIIII <br />999 <br />Barr Engineering Co. <br />MEMOBANDVM <br />To: Norm Every <br />FYom: Philip B. Solseng <br />9nbject: West EIk Miae-Landslide <br />Date: November 8, 1997 <br />Projece: 0828014RW W001 <br />The following is a discussion about the findings regarding the landslide <br />investigation, and based upon these Endings, a work plan, schedule and budget for <br />subsequent action items. Also included is a summary of the discussion with Norm <br />Every on November 5, 1997 regarding current work activities. The test well <br />program will be formally documented in a report upon completion. <br />Findings <br />The following findings are mostly relevant to cross section A-A from Figure 1 in <br />the Interim Report because of the need to understand a single cross section before <br />the entire landslide is interpreted. Most of the findings are based upon the recent <br />information from Golder Associates Faz dated 27 October, 1997 to Norm Every, <br />the information from the current test well program and the information from the <br />Interim Report (Barr, September, 1997) <br />1. The inclinometers I-6 and I-7 indicate a shear plane at about mid distance <br />between the ground surface and the cobble layer below the colluvium. <br />(Approximately 40 to 50 feet below the ground surface). <br />2. The shallow piezometers: B-8, B-9, B-10 and B-11 near the substation; <br />N-1S, N-2S, and N-3S near the fresh water pond; and B-2, B-3, B-4 and B-5 <br />neaz the MBl pond indicate a shallow (and possible perched) groundwater <br />condition (within about 10 feet from the surface). The shallow groundwater <br />oes6014\6x883-vCET <br />