Laserfiche WebLink
The Corley Company <br />Phone 632-6050 P.O. Boa 1621 <br />COLORADO SPRINGS. COLORADO 80901 <br />July 2, 1994 <br />Mr. Larry Routten <br />Division of Minerals 6 Geology <br />1313 Sherman St. <br />Denver CO 80203 <br />Dear Mr. Routten: <br />iii iiiiiiiiiiiuiii <br />~~cFniF_r~ <br />JUL 51994 <br />is^sio~ of A4incials a ueo~uey <br />Yesterday we were told by Mr. Meese, the East Pit contractor, that the <br />Division was terminating the placement of topsoil on about two acres <br />remaining on Chen's hill because of lack of funds from the GEC monies. <br />He said that there was about 1500 to 1800 cu. yds. left in the topsoil <br />pile that needed to me moved. <br />We shall insist that the money that you said had been spent from the GEC <br />bond for gulley repair in the Harrison Western area be returned to the <br />East Pit area. At least half of the $4000 spent for gulley repair <br />should still be available for the movement of the remaining topsoil. <br />Since Mr. Meese said that he was going to move his 627 scraper out of <br />the area the week of July 4 through 8, there is little time to correct <br />the allocation of funds. <br />Sincerely, <br />W~ <br />W.D. Corley, <br />President <br />