Laserfiche WebLink
. / . ~ III IIIIIIIIIIIII III <br />NjyjhS'i_PynM jT___LS19L <br />Permit date Nov_ember_3__r 1981_ Permit No. _C_028-81 <br />Permit expiration Cate November 3~_r 1q 86 <br />old File No. 79-88 <br />TrtIS PE~2MIT is issued Cy the Mined Land Reclamation <br />Division, Cepartment of Natural Resources, State of Colorado. <br />?ELj?91S <br />Coors Energy Company -___ ("operator") tlesires to <br />I. ---------- ---------- <br />Conduct a mining operation known a5 _ Keenesburg Mine _____ <br />for the purpose of extracting coal. <br />I I . Cn _October 29 ____~ 1981_ r the .M i ned Land Rec 1 amat i on <br />Division ("the division") apprcvec operator's application <br />for this permit, fixed the amount of Ddnd and directed that <br />this permit be issued upon the filing with the division of <br />bond in the amount so fixed in form and substance approved <br />by the divisions and such bond has been so furnished. <br />III. Un _O_c_tober 16_____r 1981_, the division made the fol- <br />lowing findings: <br />a) The permit application is accurate and contains <br />all information required under L.R.S. 1973. 34-33-iCl ~Y <br />~~p. and regulations promulgated thereunder and that all <br />the requirements of article 33 of title 34r L.R.S. 1973 <br />("Such drtiCle") for the i55uE Of a permit hdve been complied <br />with; <br />b) The applicant h.as demonstrated that reclamatien <br />as required by such article can be accomplished under the <br />reclamation plan contained in the permit application; <br />c) Tne assessment of the probable cumulative impact <br />of all anticipated mining in the area on the hydrologic bal- <br />ance specified in section 34-33-110(2) (1) has been made oy <br />the division and the proposed operation thereof has been <br />designed to prevent material damace to hydrologic balance <br />outside the permit area; <br />d) Granting the permit will not conflict with any <br />desiyna[ion decision issued pursuant to section 522 of the <br />rederal "iurface ~4ininy Concrcl and Reclamation act of 1977"• <br />as amended, (P.L. 95-37)r nor is the area proposed to be <br />mined within an area under Study for un5uitdCility CeSignd- <br />tion in an administrative proceeding commenced pursuant to <br />section 34-33-126 or section 52Z cf said P.L. 45-87. <br />e) (I) Unless the proposed operation was an cper- <br />acion which produced coal in commercial quantities in the <br />