Laserfiche WebLink
.. <br />Robiliard • • III IIIIIIIIIIIIIIII <br />& Associates, Inc. ~ •••`•~~~ <br />Consulting Engineers Land Surveyors Planners Construction Managers <br />August 23, 1982 <br />Mr. Scott Patten <br />Vice President <br />Flatiron Companies <br />P.O. Box 229 <br />Boulder, CO 80306 <br />Subject: Inspection Report <br />Walden Coal Company <br />Project No. 82-018-01 <br />Dear Scott: <br />We have continued to make periodic on-site inspections of the 4Jalden <br />Coal Company land reclamation program. The last inspection was made on <br />August 17, 1982. <br />We note that an additional area of approximately 500 feet by 300 feet <br />v+ithin the east dump area has been stripped of topsoil and is nearly <br />ready for fill. The 8150 contour is about completed in the east dump <br />area. All work is being performed to acceptable standards. <br />lJe note ground water in the mine area approximately 200 feet south of C <br />pond. We have been requested by the Kline Superintendent to check some <br />levels to obtain a better idea as to the source. This will be done on <br />August 24, 1982 as well as additional topographic surveying as needed. <br />Very truly yours, <br />ROBILLARD & ASSOCIATES, INC. <br />l < <~ ~- <br />~--- <br />IJorman L. Ringhand, P.E. <br />t•tanager of Engineering <br />IJLR/dc <br />f~ n !~n,, ? 1 17 ~.>n~ .'ond Flcy_x ~ ~r,r~~~ ";;1', ,1~ ~? C~7R 1 <br />. nr ~4. , <br />