My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46444
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:20:01 PM
Creation date
11/23/2007 2:39:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
10/8/1986
Doc Name
REVEGETATION SUCESS STANDARD AND TOPSOIL SALVAGE PLAN
From
COLO WESTMORELAND INC
To
MLRD
Permit Index Doc Type
SOILS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mss. <br />III IIIIIIIIIIIII III ~sn~ <br />COLORADO WESTMORELAND INC. <br />9034 East Easter Place, Suite 205. Englewood, Colorado 80112 ~ 303-779-0902 <br />October 2, 1986 <br />REC~I~E® <br />OCT 81986 <br />MINED LAND RECi.AMATiDN <br />Colo. Dept. of Haiural Resource. <br />• <br />suesioiaar of <br />WESTM CIR ELAN <br />COAL CCIMPA NV <br />Mr. Dan Matthews <br />Reclamation Specialist <br />COLORADO MINED LAND RECLAMATION DIVISION <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Co 80203 <br />Re: Revegetation Succeea Standard and Topsoil Salvage Plan <br />Dear Dan: <br />Revegetation Succeea Standard <br />After review of: 1) the originally submitted success standard, 2) <br />literature of revegetative efforts by others, 3) previous studies by CWI, <br />and 4) discussions with the Division, CWI agrees to the revegetative <br />success standard of 60R. The production standard would be 450 lbs. per <br />acre. <br />The rest of the revegetation provisions of the originally submitted <br />permit revision remain unchanged. <br />Topsoil Salvage Plan <br />After review of: 1) the originally submitted topsoil salvage plan, 2) <br />literature on reclamation efforts by others, 3) previous studies by CWI, <br />and 4) discussions with the Division, CWI agrees to salvage 32 inches of <br />Deleon soil west of East Roatcap Creek. Aa discussed with you, a <br />variance to salvage topsoil east of East Roatcap Creek or for any road <br />construction will be approved. <br />This topsoil salvage plan will permit CWI to redistribute an average <br />depth of 24 inches on disturbed areas at reclamation. CWI studies have <br />shown this ie adequate to support the revegetative efforts necessary. <br />The topsoil would be spread over the unealvaged C horizon of the Deleon <br />soil at the bottom of the fill area and the recompacted material in the <br />cut area. This material would be without coal or large rocks, which were <br />separated during initial construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.