My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46255
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:17:46 PM
Creation date
11/23/2007 2:29:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
General Documents
Doc Date
9/28/2006
Doc Name
10/04/06 Meeting between DRMS and CEMEX
From
Banks and Gesso
To
DRMS
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~l- X977 SOS <br />C s e~ <br />Banks and Gesso, LLC 720 Kipling St.,Suite117 <br />^^ Lakewood, Colorado 80215 <br />{303)274-4277 <br />RECEIVED Fax (303) 274-8329 <br />!/ www. banksandgesso.com <br />cco ^ R ~nnB <br />September 26, 2006 <br />Division of Reclamation, <br />Mining and Safety <br />Erica Crosby <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />r_.nleradc. Department of Natural Reso;rrces -- - - - - - - <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: ~tober 4`h Meeting Between DRMS and Cemex, C-Pit <br />Dear Erica: <br /> <br />~~ ~~~ <br />This letter confirms our scheduled meeting on Wednesday, October 4, 2006 at 10 a.m. <br />at.DRMS offices. In attendance on our part will be: <br />- Steve Goodrich, Plant Manager, Cemex -~ <br />,.; . <br />:. Monica Sowders, Environmental Manager, Cemex <br />- Alan Notary, P.E., Brown and Caidweil <br />- Paul Banks, Banks and Gesso, LLC <br />The purpose of the meeting is to introduce the new Cemex people and provide a <br />progress report on the tasks related to C-Pit. We would like to suggest another meeting <br />in early November, to present the detailed results of C-Pit pumping, water quality <br />monitoring and the plans for the future, which at this time are not yet finalized. <br />You had asked me in our phone conversation if there was any new data we could <br />submit prior to October 4`h. There is. <br />Attached is a graph of water surface elevation vs. time showing a 7-foot decline in the <br />C-Pit water surface due to the consumptive use pumping. The pumping ceased in early <br />August because of some process problems in the spray tower resulting from the <br />chemistry of C-Pit water. Subsequently, pumping was restarted but the pump failed. <br />Cemex is working on these matters and pumping has or will shortly resume. We will <br />report. more on this at the October 4~' meeting. <br />In addition to lowering the water level in C-Pit by pumping to the spray tovver, Cemex <br />has decreased the area of the water surface by regrading and filling in the pool at the <br />
The URL can be used to link to this page
Your browser does not support the video tag.