My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL46169
DRMS
>
Back File Migration
>
General Documents
>
GENERAL46169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:17:25 PM
Creation date
11/23/2007 2:23:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
1/20/1994
Doc Name
INVOICE 3 GEC ORPHAN PIT BOND REVOCATION PROJECT BID RN COAL MINES 8 PO C-70140
From
DMG
To
KESSLER RECLAMATION
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y- • '^ <br />ii iiiiiiiiiiiuiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, CO 80203 <br />Phone: (303) 866-3567 <br />FAX: (3031 832-8106 <br />January 20, 1994 <br />Mr. Phil Kessler <br />Kessler Reclamation <br />P.O. Box 41 <br />Rockvale, CO 81244 <br />OF Colo <br />.~~~ <br />~ !e]6 ~ <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Dinsior <br />RE: Invoice #3, G.E.C. - Orphan Pit - Bond Revocation Project <br />Bid No. RN-COAL-MINES-8, PO# C-70140 <br />Dear Mr. Kessler, <br />The Division of Minerals and Geology received your third invoice <br />for work being performed at the G.E.C.- Orphan Pit- Bond Revocation <br />Project. Several inspections have been performed at the site <br />throughout December 1993 and January 1994 to determine if required <br />work on each of the bid items listed on the invoice has been <br />completed in accordance with the specifications. The results based <br />on the invoice are as follows: <br />1. Mobilization/Demobilization- 25$ of bid amount accepted <br />for payment ($2,125.00). <br />2. Dozer Hours- 16$ of bid amount accepted for payment <br />($642.00). <br />3. Additional Rip-Rap Material- 100$ of bid amount accepted <br />for payment ($200.00). <br />4. Gully Repair (G.E.C. West Pit)- 100$ of bid amount <br />accepted for payment ($4,000.00). <br />5. Pond A Cleanout- 100$ of bid amount accepted for payment <br />(8,000.00). <br />The remaining work to be completed on site includes revegetation of <br />all reclaimed areas and construction of the West Pit diversion <br />ditch. Revegetation at the site should commence once weather <br />conditions are favorable. The Division has yet to receive the <br />revised Settlement Agreement from Dr. Corley regarding the West Pit <br />diversion ditch. The Division will notify you once this issue has <br />been resolved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.