My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45850
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:16:15 PM
Creation date
11/23/2007 2:08:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
General Documents
Doc Date
6/14/1985
Doc Name
PUEBLO WEST PIT FN 77-573
From
VALCO INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> <br />~~~~~~~~ <br />JUN 1 4 1985 <br />MINED LAND <br />RECLAMATION DIVISION <br />June 7, 1985 <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />RE: Pueblo West Pit <br />File 77-573 <br />ATTENTION: Camille Farrell <br />Reclamation Specialist <br />Dear Ms. Farrell: <br />* III IIIIIIIIIIIIIIII <br />VALCO, INC. <br />PUEBLO CONCRETE DIVISION <br />P. 0. BOX 857 <br />PUEBLO, COLORADO 81002 <br />(303) 561.6350 <br />With response to your letter of April 10, 1985 regarding our bond, <br />the following is a breakdown of the balance of reclamation for Stage I. <br />We have completed everything is Stage I except the following: <br />1. Seeding the southeast corner which are pictures one and two. <br />4.2 Acres <br />2. Backsloping an a <br />area, 250 lineal <br />and hauling dirt <br />across the lake. <br />lineal feet, has <br />four, looking at <br />rea that is 600 lineal feet in length. In this <br />feet are being worked new by placing rip rap <br />in. This is picture ik 3 looking at it from <br />The balance of the 600 feet, which is 350 <br />to be backsloped and seeded. This is picture <br />the face from across the lake. <br />After back filling and sloping, we would have to seed and plant <br />about 30 to 35 trees. This total area for seeding is 4.5 acres. My <br />estimate to finish the sloping would be 7400 yards of dirt. This is <br />based on the idea of waiting until late fall when the river goes down <br />and the water table drops. We would then pump this lake down which <br />would enable us to do a much better job. <br />The only equipment needed to do this is a 950 loader and a 922 loader <br />and two dump trucks. Figuring our present costs, we should not have a <br />cost of more than $14,000.00 to complete Stage I. <br />As for Stage II, we have already backsloped over 2500 lineal feet <br />of shore line. We will continue to back slope as we are mining. When <br />we are through mining Stage II and III this area will be used as a <br />settling pond. When it is full it will be stabilized and used as open <br />land. See our reclamation map ~~ F. I cannot see where the reclamation <br />costs would be very much. <br />ROCKY FORD LAMAR CANON CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.