Laserfiche WebLink
iii iiiiiiiuiiii iii <br />999 <br />Azarlte tOC. <br />10001 County Road 12 <br />POBox 338 <br />Cotopaxi, Co. 81223 <br />Ph: (719)942-4178 <br />Fax: (719) 942 178 <br />November 28, 2001 <br />State: of Colorado <br />Division of Minerals and Geology <br />Larry Oehler, Environmental Protection Specialist <br />1313 Sherman Street Room 215 <br />Denver, CO 80203 <br />RE: File # M-1990-047 Fremont County Quagmire Creek Pit <br />F~~+r.i .'..P', <br />1 <br />I <br />, ~.~ GeO~agY <br />9ivi;ion at Vun~. „~ <br />~N;'je ~ Z% ~d <br />~a <br />Pursuant to your August 23, 2001 inspection and recommendations, please find a map of <br />the existing Quagmire Creek Pit azea in question, and this proposed Technical Revision <br />to address the control of sediment from the disturbed azea to the surrounding watershed. <br />A sediment pond is planned for to be located at the southeastern comer of the site. The <br />approximate dimensions of tbe sediment pond are 30' wide by 60' long and no more than <br />5' deep. Tbe sediment control structure will be constructed by using topsoil material to <br />form a low berm along the southern and eastern corner of the affected land azea. No <br />berms will be constructed along the north and western aspects of the sediment pond to <br />facilitate dtrect drainage of the pit floor to the sediment pond area. A spillway will be <br />constructed at the southeastern comer of the berm to direct storm flows to Quagmire <br />Creek drainage while retaining sediment on site. The sediment control structure is not <br />intended to hold water for a long duration. Storm related accumulations aze expected to <br />percolate into the relatively porous soils with 48 hours. The spillway will be a minimum <br />of eight feet wide, 12 feet long, will beconstructed ofrip-rap no less than 8" diameter, <br />and will be constructed with 1 foot minimum freeboard relative to the berm elevation. <br />Please note that the map showing the site reflects current operating conditions. Fremont <br />Cotmty has directed the writer to proceed with a new 1 ] 0 type permit application for this <br />site reflecting 9.9 acres of disturbance. The affected land(and permit) boundaries will be <br />moved somewhat to the west and a considerable distance to the north. An application <br />document has been developed and I am cunently awaiting feedback from Division of <br />Wildlife review, a fatal lease document with the land owner west of the fence line, and <br />Exhibit S letters prior to submittal to DMG. I expect to submit the application for <br />amendment to the permit within the next 30 days. Certainly, the sediment control <br />structure will be carried over to the new mine plan The sizing of storage capacity and <br />spillway dimensions reflect projections for the watershed parameters affected by the <br />proposed larger acreage. <br />rn u P~ u~,.-~-sd~u- u.;f~ t~~ ~l« ~ r a -Z 1-~ r ~,t wilds ~~~-~~7` <br />;~ t' Drri~f«-~- >G..ti~ ~y-v~v~-C Ylri~ /~ a 5 ~t Z e<,~~c:~sr /Q-e vc~ ~s~ <br />(iuauj~ t~rv-/Clto N.il/be tx~~~. ~.e same ,:-,~sr~~.:-~.. i.~ «~ <br />•ti~~;~...,~~-~ 1~.~;C/s~b~,f ea~-G ~N Zooz~ 7~~s w;l/sue ~~e <br />,_.•v~ >`Z~-r fz<~~u~i,Q~r,~~r~. ~ee ts~e le~~~p~'~~~ a~~.~~~:a i <br />