Laserfiche WebLink
_ ...: 1 <br />PO~/VDERHORN <br />COAL COMPANY <br />November 9, 1987 <br />John 0. Singlaub <br />Area Manager <br />Bureau of Land Management <br />764 Horizon Drive <br />Grand Junction, CO 81501 <br />Dear Mr. Singlaub: <br />This letter is to advise you that the reclamation work requested in your <br />letter of September 4, 1987 is complete. The following reclamation work <br />was accomplished during September and October 1987. <br />1) The access road from the Colorado Ute powerline to the turn off <br />to PCC-10 and the turn off to PCC-09 was recontoured, fertilized, <br />seeded and mulched. A tank trap was constructed at the junction <br />with the Colorado Ute access road. <br />2) The access road to drill sites PCC-02 and PCC-03 was recountoured, <br />fertilized, seeded and mulched. <br />Please contact me when representatives from your office are ready to inspect <br />the reclamation work. <br />Sincerely. <br />~~~~~ <br />Jim Stover, P.E. <br />Chief Engineer <br />~ '~ r W L. <br />NOV 1 ~ 1987 <br />JES:ver <br />cc: T. D. Gillis / <br />MllVtu u+ivv <br />DECLAMATION DIVISION <br />POWDERHORN COAL COMPANY • P.O. BOX 1430 • Palisade, Colorado 81526 • (303) 464-7951 <br />