Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources I~~ <br />1313 Sherman St., Room 215 <br />Dcnver, Colorado 80203 <br />Phone: 13031866-3567 <br />FAX' 13031 832-8106 <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />DATE: September 1, 1994 Roy ROmer <br />Governor <br />TO: Paul Krabacher I(en sala iar <br />E.eculive DireUOr <br />FROM: Erica Crosby ~L o~~ on ob~or <br />RE: Sunlight Mine (C-81-046) <br />Paul, I finally remembered to send the information you requested on <br />the Sunlight Mine. Attached are the bid specifications for the <br />intake portal seal, various drawings, and a memo from myself <br />describing the current situation. <br />I recently spoke with Harry Ranney who inspected the intake portal <br />seal during installation. Harry stated that the concrete block <br />wall was installed according to design. The steel stop block was <br />welded to the railroad I-beam backstop per design. There are no <br />job log reports nor inspection reports to verify Harry's statement. <br />Talk to Harry Ranney or Tom Gillis for more information. <br />Please keep me posted <br />when you re-seal the <br />additional information <br />cc: Larry Routten <br />Enclosure(s) <br />on the AML work. I would like to be around <br />portal. Let me know if you need any <br />Thanks. <br />c:\sunlight\940901 <br />